Safe Behavioral Health Crisis Triage Unit

Product family: Calm Therapeutic Obs Flow.

Flow: Psychiatric Nursing & Meds → Medical Clearance Screen → Calm Recline Lounge → Psychiatrist Tele/Consult Eval → De-Escalation Med Stabilization → Warm Community Peer Hand-Off → Inpatient Psych / Community

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Safe Behavioral Health Crisis Triage UnitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Psychiatric Nursing & Meds → Medical Clearance Screen (1,418 s) → Calm Recline Lounge (1,974 s) → Psychiatrist Tele/Consult Eval (2,708 s) → De-Escalation Med Stabilization (2,126 s) → Warm Community Peer Hand-Off (1,569 s) → Inpatient Psych / Community.SUPPLIERPsychiatricNursing & MedsI0.34 d1Medical ClearanceScreenC/T 1,418 sI0.56 d2Calm ReclineLoungeC/T 1,974 sI1.16 d3PsychiatristTele/Consult EvalC/T 2,708 sI0.75 d4De-Escalation MedStabilizationC/T 2,126 sI0.66 d5Warm CommunityPeer Hand-OffC/T 1,569 sI0.25 dCUSTOMERInpatient Psych/ Community32 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Medical Clearance Screen1,418 s2 min98%97.5%311 (0.34 d)54
2. Calm Recline Lounge1,974 s4 min94%95.8%318 (0.56 d)36
3. Psychiatrist Tele/Consult Eval2,708 s12 min85%92.0%637 (1.16 d)22
4. De-Escalation Med Stabilization2,126 s6 min92%96.5%324 (0.75 d)32
5. Warm Community Peer Hand-Off1,569 s5 min94%97.2%321 (0.66 d)45

Key figures

Takt time
2,531 s
Lead time
3.84 d
Value-added time
9,795 s
Process cycle efficiency (PCE)
3.1%
Rolled throughput yield (RTY)
80.6%
Customer demand per day
32 patients
Line capacity per day
22 patients
Bottleneck
Psychiatrist Tele/Consult Eval

Reading the bottleneck

The bottleneck is "Psychiatrist Tele/Consult Eval": it can process 22 patients per day against a demand of 32 patients, so it falls short of demand by 30.4%. Once downtime and scrap are counted, its cycle time grows from 2,708 s to 3,463 s, against a takt of 2,531 s. The largest loss at this step is equipment downtime (uptime 85%), about 478 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways