Level-1 Polytrauma Helicopter Resus Bay Flow

Product family: Massive Transfusion Trauma.

Flow: HEMS Air Ambulance & O-Neg → Air Helipad Activation Call → ATLS Primary Airway Resus → FAST Ultrasound & Massive RBC → Direct Trauma OR Damage-Ctrl → SICU Ventilator Stabilization → Trauma OR / SICU

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Level-1 Polytrauma Helicopter Resus Bay FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. HEMS Air Ambulance & O-Neg → Air Helipad Activation Call (9,072 s) → ATLS Primary Airway Resus (12,636 s) → FAST Ultrasound & Massive RBC (17,334 s) → Direct Trauma OR Damage-Ctrl (13,608 s) → SICU Ventilator Stabilization (10,044 s) → Trauma OR / SICU.SUPPLIERHEMS AirAmbulance &O-NegI0.40 d1Air HelipadActivation CallC/T 9,072 sI0.60 d2ATLS PrimaryAirway ResusC/T 12,636 sI1.20 d3FAST Ultrasound &Massive RBCC/T 17,334 sI0.80 d4Direct Trauma ORDamage-CtrlC/T 13,608 sI0.60 d5SICU VentilatorStabilizationC/T 10,044 sI0.20 dCUSTOMERTrauma OR /SICU5 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Air Helipad Activation Call9,072 s2 min98%97.5%12 (0.40 d)9
2. ATLS Primary Airway Resus12,636 s4 min94%95.8%13 (0.60 d)6
3. FAST Ultrasound & Massive RBC17,334 s12 min85%92.0%16 (1.20 d)4
4. Direct Trauma OR Damage-Ctrl13,608 s6 min92%96.5%14 (0.80 d)5
5. SICU Ventilator Stabilization10,044 s5 min94%97.2%13 (0.60 d)7

Key figures

Takt time
16,200 s
Lead time
4.57 d
Value-added time
62,694 s
Process cycle efficiency (PCE)
16.9%
Rolled throughput yield (RTY)
80.6%
Customer demand per day
5 patients
Line capacity per day
4 patients
Bottleneck
FAST Ultrasound & Massive RBC

Reading the bottleneck

The bottleneck is "FAST Ultrasound & Massive RBC": it can process 4 patients per day against a demand of 5 patients, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 17,334 s to 22,166 s, against a takt of 16,200 s. The largest loss at this step is equipment downtime (uptime 85%), about 3,059 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways