25,000-Meal Airport Inflight Galley Catering

Product family: Flight-Timed Trolley Assembly.

Flow: USDA/FDA Airline Food Kitchen → Cold Prep & Blast Chill Cook → Flight Menu Tray-Set Line → Trolley Seal & Bonded Duty Check → Hi-Lift Ramp Truck Temp Log → Aircraft Galley Latch Hand-Off → Long-Haul Aircraft Galleys

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 25,000-Meal Airport Inflight Galley CateringSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. USDA/FDA Airline Food Kitchen → Cold Prep & Blast Chill Cook (123 s) → Flight Menu Tray-Set Line (147 s) → Trolley Seal & Bonded Duty Check (206 s) → Hi-Lift Ramp Truck Temp Log (131 s) → Aircraft Galley Latch Hand-Off (100 s) → Long-Haul Aircraft Galleys.SUPPLIERUSDA/FDAAirline FoodKitchenI0.50 d1Cold Prep & BlastChill CookC/T 123 sI0.70 d2Flight MenuTray-Set LineC/T 147 sI1.20 d3Trolley Seal &Bonded Duty CheckC/T 206 sI0.45 d4Hi-Lift RampTruck Temp LogC/T 131 sI0.25 d5Aircraft GalleyLatch Hand-OffC/T 100 sI0.40 dCUSTOMERLong-HaulAircraft…420 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cold Prep & Blast Chill Cook123 s3 min97%98.5%84210 (0.50 d)622
2. Flight Menu Tray-Set Line147 s5 min95%98.1%84294 (0.70 d)504
3. Trolley Seal & Bonded Duty Check206 s8 min88%91.0%63504 (1.20 d)302
4. Hi-Lift Ramp Truck Temp Log131 s2 min96%96.5%42189 (0.45 d)564
5. Aircraft Galley Latch Hand-Off100 s2 min99%99.2%42105 (0.25 d)784

Key figures

Takt time
193 s
Lead time
3.51 d
Value-added time
707 s
Process cycle efficiency (PCE)
0.25%
Rolled throughput yield (RTY)
84.2%
Customer demand per day
420 crates
Line capacity per day
302 crates
Bottleneck
Trolley Seal & Bonded Duty Check

Reading the bottleneck

The bottleneck is "Trolley Seal & Bonded Duty Check": it can process 302 crates per day against a demand of 420 crates, so it falls short of demand by 28.0%. Once downtime and scrap are counted, its cycle time grows from 206 s to 257 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 88%), about 28.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.