Thermal Spa & Wellness 90-Min Guest Circuit
Product family: Hydrotherapy & Treatment Flip.
Flow: Botanical Oils & Warm Towels → Robe Check-In & Herbal Tea → Treatment Room Herbal Steam → 60-Min Therapist Massage Flow → 12-Min Linen & Ozone Room Flip → Retail Skincare Consult Exit → Resort Wellness Guests
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Robe Check-In & Herbal Tea | 182 s | 3 min | 97% | 98.5% | 19 | 48 (0.51 d) | 137 |
| 2. Treatment Room Herbal Steam | 216 s | 5 min | 95% | 98.1% | 19 | 67 (0.71 d) | 110 |
| 3. 60-Min Therapist Massage Flow | 304 s | 8 min | 88% | 91.0% | 14 | 114 (1.20 d) | 63 |
| 4. 12-Min Linen & Ozone Room Flip | 193 s | 2 min | 96% | 96.5% | 10 | 43 (0.45 d) | 124 |
| 5. Retail Skincare Consult Exit | 148 s | 2 min | 99% | 99.2% | 10 | 24 (0.25 d) | 172 |
Key figures
- Takt time
- 284 s
- Lead time
- 3.55 d
- Value-added time
- 1,043 s
- Process cycle efficiency (PCE)
- 1.1%
- Rolled throughput yield (RTY)
- 84.2%
- Customer demand per day
- 95 patients
- Line capacity per day
- 63 patients
- Bottleneck
- 60-Min Therapist Massage Flow
Reading the bottleneck
The bottleneck is "60-Min Therapist Massage Flow": it can process 63 patients per day against a demand of 95 patients, so it falls short of demand by 34.2%. Once downtime and scrap are counted, its cycle time grows from 304 s to 380 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 88%), about 41.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospitality, Hotels, Dining & Travel Ops: Hospitality, Hotels, Dining & Travel Ops
- Hotel Room Turnaround & Guest Operations
- 5,000-Guest Mega Cruise Ship Port Turnaround
- 1,000-Cover Gala Convention Banquet Plating
- 25,000-Meal Airport Inflight Galley Catering
- Airport Flagship Business Lounge Peak Wave
- University Campus Summer Room Turnaround
- 50,000-Seat Stadium Half-Time Pour & Dog Line
- High-Volume Hotel Sheet Tunnel Washer Line
- Executive Private Aviation FBO Quick Turn
- Acute Hospital Bed Discharge EVS Terminal Clean
- High-Capacity Theme Park Coaster Dispatch Loop