1,000-Cover Gala Convention Banquet Plating

Product family: Simultaneous Hot Plate Service.

Flow: Banquet Sous-Vide Kitchen → Combi-Oven Regenerate Racks → 6-Lane Conveyor Hot Plating → Heated Cloche Queen-Mary Cart → Synchronized Captain Drop → Plate Scrape & Flight Dishwash → Convention Ballroom Tables

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1,000-Cover Gala Convention Banquet PlatingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Banquet Sous-Vide Kitchen → Combi-Oven Regenerate Racks (17.3 s) → 6-Lane Conveyor Hot Plating (20.5 s) → Heated Cloche Queen-Mary Cart (28.9 s) → Synchronized Captain Drop (18.4 s) → Plate Scrape & Flight Dishwash (14.0 s) → Convention Ballroom Tables.SUPPLIERBanquetSous-VideKitchenI0.50 d1Combi-OvenRegenerate RacksC/T 17.3 sI0.70 d26-Lane ConveyorHot PlatingC/T 20.5 sI1.20 d3Heated ClocheQueen-Mary CartC/T 28.9 sI0.45 d4SynchronizedCaptain DropC/T 18.4 sI0.25 d5Plate Scrape &Flight DishwashC/T 14.0 sI0.40 dCUSTOMERConventionBallroom Tables1,000 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Combi-Oven Regenerate Racks17.3 s3 min97%98.5%200500 (0.50 d)1,441
2. 6-Lane Conveyor Hot Plating20.5 s5 min95%98.1%200700 (0.70 d)1,159
3. Heated Cloche Queen-Mary Cart28.9 s8 min88%91.0%1501,200 (1.20 d)659
4. Synchronized Captain Drop18.4 s2 min96%96.5%100450 (0.45 d)1,299
5. Plate Scrape & Flight Dishwash14.0 s2 min99%99.2%100250 (0.25 d)1,810

Key figures

Takt time
27.0 s
Lead time
3.50 d
Value-added time
99.1 s
Process cycle efficiency (PCE)
0.10%
Rolled throughput yield (RTY)
84.2%
Customer demand per day
1,000 orders
Line capacity per day
659 orders
Bottleneck
Heated Cloche Queen-Mary Cart

Reading the bottleneck

The bottleneck is "Heated Cloche Queen-Mary Cart": it can process 659 orders per day against a demand of 1,000 orders, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 28.9 s to 36.1 s, against a takt of 27.0 s. The largest loss at this step is equipment downtime (uptime 88%), about 3.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.