High-Capacity Theme Park Coaster Dispatch Loop
Product family: 2,000 Riders/Hr Dual Station.
Flow: Continuous Queue Gates → Dual Queue Air-Gate Grouping → Loose-Article Locker Stash → Lap-Bar Restraint Optical Check → Train Dispatch Clear 38s Cycle → Unload Exit & ADA Transfer → Theme Park Guests
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Dual Queue Air-Gate Grouping | 7.2 s | 3 min | 97% | 98.5% | 960 | 2,400 (0.50 d) | 7,046 |
| 2. Loose-Article Locker Stash | 8.6 s | 5 min | 95% | 98.1% | 960 | 3,360 (0.70 d) | 5,689 |
| 3. Lap-Bar Restraint Optical Check | 12.0 s | 8 min | 88% | 91.0% | 720 | 5,760 (1.20 d) | 3,390 |
| 4. Train Dispatch Clear 38s Cycle | 7.7 s | 2 min | 96% | 96.5% | 480 | 2,160 (0.45 d) | 6,352 |
| 5. Unload Exit & ADA Transfer | 5.9 s | 2 min | 99% | 99.2% | 480 | 1,200 (0.25 d) | 8,789 |
Key figures
- Takt time
- 11.3 s
- Lead time
- 3.50 d
- Value-added time
- 41.4 s
- Process cycle efficiency (PCE)
- 0.022%
- Rolled throughput yield (RTY)
- 84.2%
- Customer demand per day
- 4,800 patients
- Line capacity per day
- 3,390 patients
- Bottleneck
- Lap-Bar Restraint Optical Check
Reading the bottleneck
The bottleneck is "Lap-Bar Restraint Optical Check": it can process 3,390 patients per day against a demand of 4,800 patients, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 12.0 s to 15.0 s, against a takt of 11.3 s. The largest loss at this step is equipment downtime (uptime 88%), about 1.6 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospitality, Hotels, Dining & Travel Ops: Hospitality, Hotels, Dining & Travel Ops
- Hotel Room Turnaround & Guest Operations
- 5,000-Guest Mega Cruise Ship Port Turnaround
- 1,000-Cover Gala Convention Banquet Plating
- 25,000-Meal Airport Inflight Galley Catering
- Thermal Spa & Wellness 90-Min Guest Circuit
- Airport Flagship Business Lounge Peak Wave
- University Campus Summer Room Turnaround
- 50,000-Seat Stadium Half-Time Pour & Dog Line
- High-Volume Hotel Sheet Tunnel Washer Line
- Executive Private Aviation FBO Quick Turn
- Acute Hospital Bed Discharge EVS Terminal Clean