5,000-Guest Mega Cruise Ship Port Turnaround
Product family: 8-Hr Provisioning & Cabin Flip.
Flow: Port Bonded Reefer Convoys → Debarkation & Luggage Belt → Crane-Load 200 Food Pallets → 2200 Stateroom Bio-Sanitize → Muster Drill & Coastguard QC → 4PM All-Aboard Sail Away → Embarking Cruise Guests
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Debarkation & Luggage Belt | 7.9 s | 3 min | 97% | 98.5% | 440 | 1,100 (0.50 d) | 3,157 |
| 2. Crane-Load 200 Food Pallets | 9.3 s | 5 min | 95% | 98.1% | 440 | 1,540 (0.70 d) | 2,555 |
| 3. 2200 Stateroom Bio-Sanitize | 13.1 s | 8 min | 88% | 91.0% | 330 | 2,640 (1.20 d) | 1,455 |
| 4. Muster Drill & Coastguard QC | 8.3 s | 2 min | 96% | 96.5% | 220 | 990 (0.45 d) | 2,880 |
| 5. 4PM All-Aboard Sail Away | 6.4 s | 2 min | 99% | 99.2% | 220 | 550 (0.25 d) | 3,959 |
Key figures
- Takt time
- 12.3 s
- Lead time
- 3.50 d
- Value-added time
- 45.0 s
- Process cycle efficiency (PCE)
- 0.048%
- Rolled throughput yield (RTY)
- 84.2%
- Customer demand per day
- 2,200 rooms
- Line capacity per day
- 1,455 rooms
- Bottleneck
- 2200 Stateroom Bio-Sanitize
Reading the bottleneck
The bottleneck is "2200 Stateroom Bio-Sanitize": it can process 1,455 rooms per day against a demand of 2,200 rooms, so it falls short of demand by 33.9%. Once downtime and scrap are counted, its cycle time grows from 13.1 s to 16.4 s, against a takt of 12.3 s. The largest loss at this step is equipment downtime (uptime 88%), about 1.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospitality, Hotels, Dining & Travel Ops: Hospitality, Hotels, Dining & Travel Ops
- Hotel Room Turnaround & Guest Operations
- 1,000-Cover Gala Convention Banquet Plating
- 25,000-Meal Airport Inflight Galley Catering
- Thermal Spa & Wellness 90-Min Guest Circuit
- Airport Flagship Business Lounge Peak Wave
- University Campus Summer Room Turnaround
- 50,000-Seat Stadium Half-Time Pour & Dog Line
- High-Volume Hotel Sheet Tunnel Washer Line
- Executive Private Aviation FBO Quick Turn
- Acute Hospital Bed Discharge EVS Terminal Clean
- High-Capacity Theme Park Coaster Dispatch Loop