Acute Hospital Bed Discharge EVS Terminal Clean

Product family: Zero-HAI UV-C Room Turnaround.

Flow: Microfiber & UV-C Robot → Discharge Alert Auto Pager → Dirty Strip & High-Touch Wipe → Pulsed-Xenon UV-C Robot Cycle → ATP Swab Audit & Bed Make → Electronic Clean-Ready Flag → ED Bed Management Queue

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Acute Hospital Bed Discharge EVS Terminal CleanSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Microfiber & UV-C Robot → Discharge Alert Auto Pager (370 s) → Dirty Strip & High-Touch Wipe (440 s) → Pulsed-Xenon UV-C Robot Cycle (619 s) → ATP Swab Audit & Bed Make (393 s) → Electronic Clean-Ready Flag (301 s) → ED Bed Management Queue.SUPPLIERMicrofiber &UV-C RobotI0.50 d1Discharge AlertAuto PagerC/T 370 sI0.70 d2Dirty Strip &High-Touch WipeC/T 440 sI1.20 d3Pulsed-Xenon UV-CRobot CycleC/T 619 sI0.45 d4ATP Swab Audit &Bed MakeC/T 393 sI0.25 d5ElectronicClean-Ready FlagC/T 301 sI0.40 dCUSTOMERED BedManagement…140 / rooms

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Discharge Alert Auto Pager370 s3 min97%98.5%2870 (0.50 d)207
2. Dirty Strip & High-Touch Wipe440 s5 min95%98.1%2898 (0.70 d)168
3. Pulsed-Xenon UV-C Robot Cycle619 s8 min88%91.0%21168 (1.20 d)101
4. ATP Swab Audit & Bed Make393 s2 min96%96.5%1463 (0.45 d)188
5. Electronic Clean-Ready Flag301 s2 min99%99.2%1435 (0.25 d)260

Key figures

Takt time
579 s
Lead time
3.53 d
Value-added time
2,123 s
Process cycle efficiency (PCE)
0.74%
Rolled throughput yield (RTY)
84.2%
Customer demand per day
140 rooms
Line capacity per day
101 rooms
Bottleneck
Pulsed-Xenon UV-C Robot Cycle

Reading the bottleneck

The bottleneck is "Pulsed-Xenon UV-C Robot Cycle": it can process 101 rooms per day against a demand of 140 rooms, so it falls short of demand by 28.1%. Once downtime and scrap are counted, its cycle time grows from 619 s to 773 s, against a takt of 579 s. The largest loss at this step is equipment downtime (uptime 88%), about 84.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.