High-Volume Hotel Sheet Tunnel Washer Line
Product family: 50-Ton/Day Barrier Laundry.
Flow: City 4/5-Star Hotels → UHF RFID Bag Dump & Sort → 14-Compartment Tunnel Washer → 60-Bar Centrifugal Press Cake → High-Speed Ironer & Auto Fold → RFID Cage Dispatch by Property → Hotel Linen Lockers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. UHF RFID Bag Dump & Sort | 7.7 s | 3 min | 97% | 98.5% | 900 | 2,250 (0.50 d) | 6,589 |
| 2. 14-Compartment Tunnel Washer | 9.1 s | 5 min | 95% | 98.1% | 900 | 3,150 (0.70 d) | 5,377 |
| 3. 60-Bar Centrifugal Press Cake | 12.8 s | 8 min | 88% | 91.0% | 675 | 5,400 (1.20 d) | 3,178 |
| 4. High-Speed Ironer & Auto Fold | 8.2 s | 2 min | 96% | 96.5% | 450 | 2,025 (0.45 d) | 5,965 |
| 5. RFID Cage Dispatch by Property | 6.2 s | 2 min | 99% | 99.2% | 450 | 1,125 (0.25 d) | 8,364 |
Key figures
- Takt time
- 12.0 s
- Lead time
- 3.50 d
- Value-added time
- 44.0 s
- Process cycle efficiency (PCE)
- 0.023%
- Rolled throughput yield (RTY)
- 84.2%
- Customer demand per day
- 4,500 crates
- Line capacity per day
- 3,178 crates
- Bottleneck
- 60-Bar Centrifugal Press Cake
Reading the bottleneck
The bottleneck is "60-Bar Centrifugal Press Cake": it can process 3,178 crates per day against a demand of 4,500 crates, so it falls short of demand by 29.4%. Once downtime and scrap are counted, its cycle time grows from 12.8 s to 16.0 s, against a takt of 12.0 s. The largest loss at this step is equipment downtime (uptime 88%), about 1.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Hospitality, Hotels, Dining & Travel Ops: Hospitality, Hotels, Dining & Travel Ops
- Hotel Room Turnaround & Guest Operations
- 5,000-Guest Mega Cruise Ship Port Turnaround
- 1,000-Cover Gala Convention Banquet Plating
- 25,000-Meal Airport Inflight Galley Catering
- Thermal Spa & Wellness 90-Min Guest Circuit
- Airport Flagship Business Lounge Peak Wave
- University Campus Summer Room Turnaround
- 50,000-Seat Stadium Half-Time Pour & Dog Line
- Executive Private Aviation FBO Quick Turn
- Acute Hospital Bed Discharge EVS Terminal Clean
- High-Capacity Theme Park Coaster Dispatch Loop