50,000-Seat Stadium Half-Time Pour & Dog Line

Product family: 15-Min Peak Beverage/Food Burst.

Flow: Commissary Keg & Bun Vaults → Pre-Half-Time Foil Hold Grill → Reverse-Tap Bottom-Up Beer → QR Mobile Express Pickup Bay → Frictionless Walk-Out Gate → Post-Whistle Wash & Restock → Matchday Half-Time Fans

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 50,000-Seat Stadium Half-Time Pour & Dog LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Commissary Keg & Bun Vaults → Pre-Half-Time Foil Hold Grill (2.7 s) → Reverse-Tap Bottom-Up Beer (3.2 s) → QR Mobile Express Pickup Bay (4.4 s) → Frictionless Walk-Out Gate (2.8 s) → Post-Whistle Wash & Restock (2.2 s) → Matchday Half-Time Fans.SUPPLIERCommissary Keg& Bun VaultsI0.50 d1Pre-Half-TimeFoil Hold GrillC/T 2.7 sI0.70 d2Reverse-TapBottom-Up BeerC/T 3.2 sI1.20 d3QR Mobile ExpressPickup BayC/T 4.4 sI0.45 d4FrictionlessWalk-Out GateC/T 2.8 sI0.25 d5Post-Whistle Wash& RestockC/T 2.2 sI0.40 dCUSTOMERMatchdayHalf-Time Fans6,500 / orders

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pre-Half-Time Foil Hold Grill2.7 s3 min97%98.5%1,3003,250 (0.50 d)9,236
2. Reverse-Tap Bottom-Up Beer3.2 s5 min95%98.1%1,3004,550 (0.70 d)7,426
3. QR Mobile Express Pickup Bay4.4 s8 min88%91.0%9757,800 (1.20 d)4,332
4. Frictionless Walk-Out Gate2.8 s2 min96%96.5%6502,925 (0.45 d)8,536
5. Post-Whistle Wash & Restock2.2 s2 min99%99.2%6501,625 (0.25 d)11,517

Key figures

Takt time
4.2 s
Lead time
3.50 d
Value-added time
15.3 s
Process cycle efficiency (PCE)
0.016%
Rolled throughput yield (RTY)
84.2%
Customer demand per day
6,500 orders
Line capacity per day
4,332 orders
Bottleneck
QR Mobile Express Pickup Bay

Reading the bottleneck

The bottleneck is "QR Mobile Express Pickup Bay": it can process 4,332 orders per day against a demand of 6,500 orders, so it falls short of demand by 33.4%. Once downtime and scrap are counted, its cycle time grows from 4.4 s to 5.5 s, against a takt of 4.2 s. The largest loss at this step is equipment downtime (uptime 88%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Hospitality, Hotels, Dining & Travel Ops: Hospitality, Hotels, Dining & Travel Ops