Animal-Origin-Free Dry Powder Cell Media Mill
Product family: Chemically Defined CHO Media.
Flow: USP Amino Acids & Vitamins → 45-Ingredient Trace Weighing → Cryo Pin-Mill Co-Grinding → V-Blender CV<2% Uniformity → Foil Drum Nitrogen Inerting → Cell Growth Assay vs Ref Lot → Biologics Manufacturing Plants
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 45-Ingredient Trace Weighing | 432 s | 30 min | 95% | 98.4% | 90 | 144 (1.60 d) | 113 |
| 2. Cryo Pin-Mill Co-Grinding | 516 s | 40 min | 91% | 97.2% | 135 | 162 (1.80 d) | 90 |
| 3. V-Blender CV<2% Uniformity | 648 s | 60 min | 84% | 94.5% | 90 | 216 (2.40 d) | 62 |
| 4. Foil Drum Nitrogen Inerting | 468 s | 25 min | 93% | 98.1% | 45 | 108 (1.20 d) | 99 |
| 5. Cell Growth Assay vs Ref Lot | 396 s | 15 min | 95% | 97.8% | 72 | 135 (1.50 d) | 124 |
Key figures
- Takt time
- 600 s
- Lead time
- 10.0 d
- Value-added time
- 2,460 s
- Process cycle efficiency (PCE)
- 0.45%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 90 batches
- Line capacity per day
- 62 batches
- Bottleneck
- V-Blender CV<2% Uniformity
Reading the bottleneck
The bottleneck is "V-Blender CV<2% Uniformity": it can process 62 batches per day against a demand of 90 batches, so it falls short of demand by 31.4%. Once downtime and scrap are counted, its cycle time grows from 648 s to 816 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 84%), about 123 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Biologics, mRNA & Cell Therapy: Biologics, mRNA & Cell Therapy
- 2000L Monoclonal Antibody (mAb) CHO Plant
- AAV / Lentiviral Gene Therapy GMP Cleanroom
- Autologous Patient-Specific CAR-T Therapy Lot
- 10,000L Microbial E.Coli Insulin Fermentation
- Human Plasma Immunoglobulin Cold-Ethanol Prep
- Recombinant Antigen + Liposome Vaccine Bulk
- GMP Linearized Plasmid DNA Template Plant
- ISO-7 Single-Use Bioprocess Tubing Assembly
- Antibody-Drug Conjugate (ADC) Payload Link
- Thermostable Taq Polymerase Enzyme Ferment
- Solid-Phase Oligonucleotide & siRNA Synthesis