Human Plasma Immunoglobulin Cold-Ethanol Prep

Product family: IVIG 10% Sterile Globulins.

Flow: Accredited Plasma Centers → Pool Cryoprecipitate Thaw → Cohn Cold-Ethanol Centrifuge → Solvent-Detergent Viral Kill → Chromatography & 20nm Filter → IgG Potency & Endotoxin Release → Immunology Hospital Supply

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Human Plasma Immunoglobulin Cold-Ethanol PrepSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Accredited Plasma Centers → Pool Cryoprecipitate Thaw (1,823 s) → Cohn Cold-Ethanol Centrifuge (2,177 s) → Solvent-Detergent Viral Kill (2,734 s) → Chromatography & 20nm Filter (1,974 s) → IgG Potency & Endotoxin Release (1,671 s) → Immunology Hospital Supply.SUPPLIERAccreditedPlasma CentersI1.59 d1PoolCryoprecipitate…C/T 1,823 sI1.81 d2Cohn Cold-EthanolCentrifugeC/T 2,177 sI2.41 d3Solvent-DetergentViral KillC/T 2,734 sI1.19 d4Chromatography &20nm FilterC/T 1,974 sI1.50 d5IgG Potency &Endotoxin ReleaseC/T 1,671 sI1.50 dCUSTOMERImmunologyHospital Supply32 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pool Cryoprecipitate Thaw1,823 s30 min95%98.4%3251 (1.59 d)41
2. Cohn Cold-Ethanol Centrifuge2,177 s40 min91%97.2%4858 (1.81 d)32
3. Solvent-Detergent Viral Kill2,734 s60 min84%94.5%3277 (2.41 d)22
4. Chromatography & 20nm Filter1,974 s25 min93%98.1%1638 (1.19 d)36
5. IgG Potency & Endotoxin Release1,671 s15 min95%97.8%2648 (1.50 d)44

Key figures

Takt time
2,531 s
Lead time
10.1 d
Value-added time
10,379 s
Process cycle efficiency (PCE)
1.3%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
32 batches
Line capacity per day
22 batches
Bottleneck
Solvent-Detergent Viral Kill

Reading the bottleneck

The bottleneck is "Solvent-Detergent Viral Kill": it can process 22 batches per day against a demand of 32 batches, so it falls short of demand by 29.8%. Once downtime and scrap are counted, its cycle time grows from 2,734 s to 3,444 s, against a takt of 2,531 s. The largest loss at this step is equipment downtime (uptime 84%), about 521 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.