10,000L Microbial E.Coli Insulin Fermentation

Product family: Biosimilar Human Insulin API.

Flow: Industrial Yeast/E.Coli Feeds → Seed Tank & 10m³ Fermenter → High-Pressure Cell Homogenizer → Inclusion Body Refold & Cleave → RP-HPLC Prep Purity Columns → Lyophilized Bulk API Crystal → Cartridge & Pen Fill Plants

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 10,000L Microbial E.Coli Insulin FermentationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Industrial Yeast/E.Coli Feeds → Seed Tank & 10m³ Fermenter (1,296 s) → High-Pressure Cell Homogenizer (1,548 s) → Inclusion Body Refold & Cleave (1,944 s) → RP-HPLC Prep Purity Columns (1,404 s) → Lyophilized Bulk API Crystal (1,188 s) → Cartridge & Pen Fill Plants.SUPPLIERIndustrialYeast/E.ColiFeedsI1.60 d1Seed Tank & 10m³FermenterC/T 1,296 sI1.80 d2High-PressureCell HomogenizerC/T 1,548 sI2.40 d3Inclusion BodyRefold & CleaveC/T 1,944 sI1.20 d4RP-HPLC PrepPurity ColumnsC/T 1,404 sI1.51 d5Lyophilized BulkAPI CrystalC/T 1,188 sI1.51 dCUSTOMERCartridge & PenFill Plants45 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Seed Tank & 10m³ Fermenter1,296 s30 min95%98.4%4572 (1.60 d)57
2. High-Pressure Cell Homogenizer1,548 s40 min91%97.2%6881 (1.80 d)45
3. Inclusion Body Refold & Cleave1,944 s60 min84%94.5%45108 (2.40 d)32
4. RP-HPLC Prep Purity Columns1,404 s25 min93%98.1%2354 (1.20 d)51
5. Lyophilized Bulk API Crystal1,188 s15 min95%97.8%3668 (1.51 d)62

Key figures

Takt time
1,800 s
Lead time
10.1 d
Value-added time
7,380 s
Process cycle efficiency (PCE)
0.90%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
45 batches
Line capacity per day
32 batches
Bottleneck
Inclusion Body Refold & Cleave

Reading the bottleneck

The bottleneck is "Inclusion Body Refold & Cleave": it can process 32 batches per day against a demand of 45 batches, so it falls short of demand by 29.8%. Once downtime and scrap are counted, its cycle time grows from 1,944 s to 2,449 s, against a takt of 1,800 s. The largest loss at this step is equipment downtime (uptime 84%), about 370 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.