ISO-7 Single-Use Bioprocess Tubing Assembly

Product family: Pre-Irradiated Gamma Manifolds.

Flow: Silicone & Tubing Suppliers → Automated Hose Laser Cut → Cleanroom Barb & Weld Fit → Filter Integrity Pressure Test → Double Bag & Gamma Dosimeter → 45kGy Sterility Release → Biopharma CDMOs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: ISO-7 Single-Use Bioprocess Tubing AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Silicone & Tubing Suppliers → Automated Hose Laser Cut (81.0 s) → Cleanroom Barb & Weld Fit (97.0 s) → Filter Integrity Pressure Test (122 s) → Double Bag & Gamma Dosimeter (88.0 s) → 45kGy Sterility Release (74.0 s) → Biopharma CDMOs.SUPPLIERSilicone &TubingSuppliersI1.60 d1Automated HoseLaser CutC/T 81.0 sI1.80 d2Cleanroom Barb &Weld FitC/T 97.0 sI2.40 d3Filter IntegrityPressure TestC/T 122 sI1.20 d4Double Bag &Gamma DosimeterC/T 88.0 sI1.50 d545kGy SterilityReleaseC/T 74.0 sI1.50 dCUSTOMERBiopharma CDMOs480 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Automated Hose Laser Cut81.0 s30 min95%98.4%480768 (1.60 d)602
2. Cleanroom Barb & Weld Fit97.0 s40 min91%97.2%720864 (1.80 d)478
3. Filter Integrity Pressure Test122 s60 min84%94.5%4801,152 (2.40 d)328
4. Double Bag & Gamma Dosimeter88.0 s25 min93%98.1%240576 (1.20 d)529
5. 45kGy Sterility Release74.0 s15 min95%97.8%384720 (1.50 d)664

Key figures

Takt time
113 s
Lead time
10.0 d
Value-added time
462 s
Process cycle efficiency (PCE)
0.085%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
480 assemblies
Line capacity per day
328 assemblies
Bottleneck
Filter Integrity Pressure Test

Reading the bottleneck

The bottleneck is "Filter Integrity Pressure Test": it can process 328 assemblies per day against a demand of 480 assemblies, so it falls short of demand by 31.7%. Once downtime and scrap are counted, its cycle time grows from 122 s to 154 s, against a takt of 113 s. The largest loss at this step is equipment downtime (uptime 84%), about 23.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Biologics, mRNA & Cell Therapy: Biologics, mRNA & Cell Therapy