Recombinant Antigen + Liposome Vaccine Bulk
Product family: Next-Gen Adjuvanted Vaccines.
Flow: Squalene & QS-21 Suppliers → Sf9 Insect Cell Bioreactor → TFF Diafiltration & Capture → Liposome High-Shear Size 90nm → Sterile 0.22um Bulk Hold → DLS Particle Size & Endotoxin → Global Pandemic Vaccine Fill
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Sf9 Insect Cell Bioreactor | 972 s | 30 min | 95% | 98.4% | 40 | 64 (1.60 d) | 50 |
| 2. TFF Diafiltration & Capture | 1,161 s | 40 min | 91% | 97.2% | 60 | 72 (1.80 d) | 40 |
| 3. Liposome High-Shear Size 90nm | 1,458 s | 60 min | 84% | 94.5% | 40 | 96 (2.40 d) | 27 |
| 4. Sterile 0.22um Bulk Hold | 1,053 s | 25 min | 93% | 98.1% | 20 | 48 (1.20 d) | 44 |
| 5. DLS Particle Size & Endotoxin | 891 s | 15 min | 95% | 97.8% | 32 | 60 (1.50 d) | 55 |
Key figures
- Takt time
- 1,350 s
- Lead time
- 10.1 d
- Value-added time
- 5,535 s
- Process cycle efficiency (PCE)
- 1.0%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 40 batches
- Line capacity per day
- 27 batches
- Bottleneck
- Liposome High-Shear Size 90nm
Reading the bottleneck
The bottleneck is "Liposome High-Shear Size 90nm": it can process 27 batches per day against a demand of 40 batches, so it falls short of demand by 31.4%. Once downtime and scrap are counted, its cycle time grows from 1,458 s to 1,837 s, against a takt of 1,350 s. The largest loss at this step is equipment downtime (uptime 84%), about 278 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Biologics, mRNA & Cell Therapy: Biologics, mRNA & Cell Therapy
- 2000L Monoclonal Antibody (mAb) CHO Plant
- AAV / Lentiviral Gene Therapy GMP Cleanroom
- Autologous Patient-Specific CAR-T Therapy Lot
- 10,000L Microbial E.Coli Insulin Fermentation
- Human Plasma Immunoglobulin Cold-Ethanol Prep
- GMP Linearized Plasmid DNA Template Plant
- ISO-7 Single-Use Bioprocess Tubing Assembly
- Antibody-Drug Conjugate (ADC) Payload Link
- Thermostable Taq Polymerase Enzyme Ferment
- Solid-Phase Oligonucleotide & siRNA Synthesis
- Animal-Origin-Free Dry Powder Cell Media Mill