Tier-1 Backbone Router 400G Linecard Upgrade

Product family: Night Window Core Maintenance.

Flow: Core Router Optics → MOP Method of Procedure Peer → ISIS / BGP Graceful Drain → Linecard Swap & Optics Clean → CRC Zero-Error Traffic Restore → Telemetry Flow Baseline Clear → National ISP Traffic Backbone

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Tier-1 Backbone Router 400G Linecard UpgradeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Core Router Optics → MOP Method of Procedure Peer (1,836 s) → ISIS / BGP Graceful Drain (2,106 s) → Linecard Swap & Optics Clean (2,916 s) → CRC Zero-Error Traffic Restore (1,944 s) → Telemetry Flow Baseline Clear (1,215 s) → National ISP Traffic Backbone.SUPPLIERCore RouterOpticsI2.00 d1MOP Method ofProcedure PeerC/T 1,836 sI1.80 d2ISIS / BGPGraceful DrainC/T 2,106 sI2.60 d3Linecard Swap &Optics CleanC/T 2,916 sI0.80 d4CRC Zero-ErrorTraffic RestoreC/T 1,944 sI0.40 d5Telemetry FlowBaseline ClearC/T 1,215 sI0.50 dCUSTOMERNational ISPTraffic…10 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. MOP Method of Procedure Peer1,836 s5 min95%93.0%320 (2.00 d)13
2. ISIS / BGP Graceful Drain2,106 s15 min92%95.8%418 (1.80 d)10
3. Linecard Swap & Optics Clean2,916 s20 min84%91.0%326 (2.60 d)6
4. CRC Zero-Error Traffic Restore1,944 s5 min95%96.8%28 (0.80 d)12
5. Telemetry Flow Baseline Clear1,215 s2 min99%99.1%14 (0.40 d)22

Key figures

Takt time
2,700 s
Lead time
8.47 d
Value-added time
10,017 s
Process cycle efficiency (PCE)
4.4%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
10 lines
Line capacity per day
6 lines
Bottleneck
Linecard Swap & Optics Clean

Reading the bottleneck

The bottleneck is "Linecard Swap & Optics Clean": it can process 6 lines per day against a demand of 10 lines, so it falls short of demand by 39.7%. Once downtime and scrap are counted, its cycle time grows from 2,916 s to 3,815 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 84%), about 555 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Telecom Networks, Fiber FTTH & 5G: Telecom Networks, Fiber FTTH & 5G