Metro Dark Fiber Ring Lease & Splicing Turn-Up

Product family: Low-Latency Financial Rings.

Flow: Municipal Duct Conduits → GIS Duct Route & Manhole Check → Air-Blown Micro-Duct Fiber → Mid-Span Splice Vault Closure → Chromatic Dispersion & OTDR → Handover Test As-Built DWG → HFT Finance & Data Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Metro Dark Fiber Ring Lease & Splicing Turn-UpSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Municipal Duct Conduits → GIS Duct Route & Manhole Check (2,295 s) → Air-Blown Micro-Duct Fiber (2,633 s) → Mid-Span Splice Vault Closure (3,645 s) → Chromatic Dispersion & OTDR (2,430 s) → Handover Test As-Built DWG (1,519 s) → HFT Finance & Data Centers.SUPPLIERMunicipal DuctConduitsI2.00 d1GIS Duct Route &Manhole CheckC/T 2,295 sI1.75 d2Air-BlownMicro-Duct FiberC/T 2,633 sI2.63 d3Mid-Span SpliceVault ClosureC/T 3,645 sI0.75 d4ChromaticDispersion & OTDRC/T 2,430 sI0.38 d5Handover TestAs-Built DWGC/T 1,519 sI0.50 dCUSTOMERHFT Finance &Data Centers8 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. GIS Duct Route & Manhole Check2,295 s5 min95%93.0%216 (2.00 d)10
2. Air-Blown Micro-Duct Fiber2,633 s15 min92%95.8%314 (1.75 d)8
3. Mid-Span Splice Vault Closure3,645 s20 min84%91.0%221 (2.63 d)5
4. Chromatic Dispersion & OTDR2,430 s5 min95%96.8%16 (0.75 d)10
5. Handover Test As-Built DWG1,519 s2 min99%99.1%13 (0.38 d)17

Key figures

Takt time
3,375 s
Lead time
8.46 d
Value-added time
12,522 s
Process cycle efficiency (PCE)
5.5%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
8 lines
Line capacity per day
5 lines
Bottleneck
Mid-Span Splice Vault Closure

Reading the bottleneck

The bottleneck is "Mid-Span Splice Vault Closure": it can process 5 lines per day against a demand of 8 lines, so it falls short of demand by 41.8%. Once downtime and scrap are counted, its cycle time grows from 3,645 s to 4,768 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 84%), about 694 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.