MVNO Wholesale CDR Mediation & Invoice Cycle

Product family: Monthly 2M Subscriber Rating.

Flow: Host MNO Diameter/CDR Feeds → Raw Diameter Tap Collection → Roaming TAP3 Tariff Deduplicate → Unrated CDR Exception Fix → Partner Invoice & Tax Verify → Finance GL Revenue Post → Retail MVNO Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: MVNO Wholesale CDR Mediation & Invoice CycleSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Host MNO Diameter/CDR Feeds → Raw Diameter Tap Collection (765 s) → Roaming TAP3 Tariff Deduplicate (878 s) → Unrated CDR Exception Fix (1,215 s) → Partner Invoice & Tax Verify (810 s) → Finance GL Revenue Post (506 s) → Retail MVNO Brands.SUPPLIERHost MNODiameter/CDRFeedsI2.00 d1Raw Diameter TapCollectionC/T 765 sI1.79 d2Roaming TAP3Tariff…C/T 878 sI2.58 d3Unrated CDRException FixC/T 1,215 sI0.79 d4Partner Invoice &Tax VerifyC/T 810 sI0.42 d5Finance GLRevenue PostC/T 506 sI0.50 dCUSTOMERRetail MVNOBrands24 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Raw Diameter Tap Collection765 s5 min95%93.0%748 (2.00 d)30
2. Roaming TAP3 Tariff Deduplicate878 s15 min92%95.8%1043 (1.79 d)25
3. Unrated CDR Exception Fix1,215 s20 min84%91.0%762 (2.58 d)14
4. Partner Invoice & Tax Verify810 s5 min95%96.8%419 (0.79 d)29
5. Finance GL Revenue Post506 s2 min99%99.1%210 (0.42 d)50

Key figures

Takt time
1,125 s
Lead time
8.24 d
Value-added time
4,174 s
Process cycle efficiency (PCE)
1.9%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
24 batches
Line capacity per day
14 batches
Bottleneck
Unrated CDR Exception Fix

Reading the bottleneck

The bottleneck is "Unrated CDR Exception Fix": it can process 14 batches per day against a demand of 24 batches, so it falls short of demand by 40.0%. Once downtime and scrap are counted, its cycle time grows from 1,215 s to 1,589 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 84%), about 231 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.