Rural 5G Fixed-Wireless (FWA) Outdoor CPE Setup
Product family: Same-Week Countryside Broadband.
Flow: Fixed-Wireless Outdoor CPE → Coverage Signal Qualification → Gable Mount & Cat6 Entry Seal → 5G NR Tower Beam Aiming → Mesh Wi-Fi Coverage Walk → Subscriber Speedtest Sign → Unserved Rural Households
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Coverage Signal Qualification | 167 s | 5 min | 95% | 93.0% | 33 | 220 (2.00 d) | 138 |
| 2. Gable Mount & Cat6 Entry Seal | 191 s | 15 min | 92% | 95.8% | 44 | 198 (1.80 d) | 114 |
| 3. 5G NR Tower Beam Aiming | 265 s | 20 min | 84% | 91.0% | 33 | 286 (2.60 d) | 66 |
| 4. Mesh Wi-Fi Coverage Walk | 177 s | 5 min | 95% | 96.8% | 17 | 88 (0.80 d) | 130 |
| 5. Subscriber Speedtest Sign | 110 s | 2 min | 99% | 99.1% | 11 | 44 (0.40 d) | 230 |
Key figures
- Takt time
- 245 s
- Lead time
- 8.13 d
- Value-added time
- 910 s
- Process cycle efficiency (PCE)
- 0.41%
- Rolled throughput yield (RTY)
- 77.8%
- Customer demand per day
- 110 lines
- Line capacity per day
- 66 lines
- Bottleneck
- 5G NR Tower Beam Aiming
Reading the bottleneck
The bottleneck is "5G NR Tower Beam Aiming": it can process 66 lines per day against a demand of 110 lines, so it falls short of demand by 39.7%. Once downtime and scrap are counted, its cycle time grows from 265 s to 347 s, against a takt of 245 s. The largest loss at this step is equipment downtime (uptime 84%), about 50.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Telecom Networks, Fiber FTTH & 5G: Telecom Networks, Fiber FTTH & 5G
- FTTH Fiber Drop & Service Activation
- 5G Standalone (SA) Urban Macro Site Upgrade
- Global Enterprise SD-WAN Retail Branch Cutover
- Colocation Data Center Fiber Cross-Connect SLA
- B2B Fleet IoT Global eSIM M2M Activation Flow
- Enterprise SIP Trunk & Regulatory Number Port
- Metro Dark Fiber Ring Lease & Splicing Turn-Up
- Licensed E-Band 10Gbps Microwave Backhaul Link
- Tier-1 Backbone Router 400G Linecard Upgrade
- MVNO Wholesale CDR Mediation & Invoice Cycle
- Subsea Repeatered Cable Ship Shunt Fault Fix