Licensed E-Band 10Gbps Microwave Backhaul Link
Product family: Line-of-Sight Rooftop Dish.
Flow: Microwave Radio Vendors (E-Band) → LOS Fresnel Path & Reg Lic → Rooftop Mast & PoE Wiring → Dish Azimuth Peak Alignment → ACM Adaptive Modulation Hold → 24h Fade-Margin Link Acceptance → Rural 5G & Island Towers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. LOS Fresnel Path & Reg Lic | 1,020 s | 5 min | 95% | 93.0% | 5 | 36 (2.00 d) | 22 |
| 2. Rooftop Mast & PoE Wiring | 1,170 s | 15 min | 92% | 95.8% | 7 | 32 (1.78 d) | 19 |
| 3. Dish Azimuth Peak Alignment | 1,620 s | 20 min | 84% | 91.0% | 5 | 47 (2.61 d) | 11 |
| 4. ACM Adaptive Modulation Hold | 1,080 s | 5 min | 95% | 96.8% | 3 | 14 (0.78 d) | 21 |
| 5. 24h Fade-Margin Link Acceptance | 675 s | 2 min | 99% | 99.1% | 2 | 7 (0.39 d) | 38 |
Key figures
- Takt time
- 1,500 s
- Lead time
- 8.26 d
- Value-added time
- 5,565 s
- Process cycle efficiency (PCE)
- 2.5%
- Rolled throughput yield (RTY)
- 77.8%
- Customer demand per day
- 18 lines
- Line capacity per day
- 11 lines
- Bottleneck
- Dish Azimuth Peak Alignment
Reading the bottleneck
The bottleneck is "Dish Azimuth Peak Alignment": it can process 11 lines per day against a demand of 18 lines, so it falls short of demand by 40.5%. Once downtime and scrap are counted, its cycle time grows from 1,620 s to 2,119 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 84%), about 309 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Telecom Networks, Fiber FTTH & 5G: Telecom Networks, Fiber FTTH & 5G
- FTTH Fiber Drop & Service Activation
- 5G Standalone (SA) Urban Macro Site Upgrade
- Global Enterprise SD-WAN Retail Branch Cutover
- Colocation Data Center Fiber Cross-Connect SLA
- B2B Fleet IoT Global eSIM M2M Activation Flow
- Enterprise SIP Trunk & Regulatory Number Port
- Metro Dark Fiber Ring Lease & Splicing Turn-Up
- Rural 5G Fixed-Wireless (FWA) Outdoor CPE Setup
- Tier-1 Backbone Router 400G Linecard Upgrade
- MVNO Wholesale CDR Mediation & Invoice Cycle
- Subsea Repeatered Cable Ship Shunt Fault Fix