B2B Fleet IoT Global eSIM M2M Activation Flow

Product family: 10,000-Device Connected Car.

Flow: GSMA SM-DP+ Profile Servers → IMSI Profile Pool Allocation → Factory OTA Bootstrap Attach → Local Carrier Roaming Switch → APN Private Tunnel Verify → Bulk Fleet Billing Start → Connected EV & Fleet OEMs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: B2B Fleet IoT Global eSIM M2M Activation FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. GSMA SM-DP+ Profile Servers → IMSI Profile Pool Allocation (30.6 s) → Factory OTA Bootstrap Attach (35.1 s) → Local Carrier Roaming Switch (49.0 s) → APN Private Tunnel Verify (32.4 s) → Bulk Fleet Billing Start (20.3 s) → Connected EV & Fleet OEMs.SUPPLIERGSMA SM-DP+Profile ServersI2.00 d1IMSI Profile PoolAllocationC/T 30.6 sI1.80 d2Factory OTABootstrap AttachC/T 35.1 sI2.60 d3Local CarrierRoaming SwitchC/T 49.0 sI0.80 d4APN PrivateTunnel VerifyC/T 32.4 sI0.40 d5Bulk FleetBilling StartC/T 20.3 sI0.50 dCUSTOMERConnected EV &Fleet OEMs1,200 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. IMSI Profile Pool Allocation30.6 s5 min95%93.0%3602,400 (2.00 d)1,530
2. Factory OTA Bootstrap Attach35.1 s15 min92%95.8%4802,160 (1.80 d)1,299
3. Local Carrier Roaming Switch49.0 s20 min84%91.0%3603,120 (2.60 d)780
4. APN Private Tunnel Verify32.4 s5 min95%96.8%180960 (0.80 d)1,476
5. Bulk Fleet Billing Start20.3 s2 min99%99.1%120480 (0.40 d)2,552

Key figures

Takt time
45.0 s
Lead time
8.10 d
Value-added time
167 s
Process cycle efficiency (PCE)
0.038%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
1,200 lines
Line capacity per day
780 lines
Bottleneck
Local Carrier Roaming Switch

Reading the bottleneck

The bottleneck is "Local Carrier Roaming Switch": it can process 780 lines per day against a demand of 1,200 lines, so it falls short of demand by 35.0%. Once downtime and scrap are counted, its cycle time grows from 49.0 s to 64.1 s, against a takt of 45.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 9.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Telecom Networks, Fiber FTTH & 5G: Telecom Networks, Fiber FTTH & 5G