5G Standalone (SA) Urban Macro Site Upgrade

Product family: 3.5GHz Massive-MIMO Tower.

Flow: Mobile Radio Vendors → Structural Load & RF Permit → Crane Climb & AAU Mount → CPRI Fiber Drop & DC Power → RAN Parameter & Drive Test → NOC Commercial 5G Cutover → Mobile Network Operations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 5G Standalone (SA) Urban Macro Site UpgradeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mobile Radio Vendors → Structural Load & RF Permit (1,311 s) → Crane Climb & AAU Mount (1,504 s) → CPRI Fiber Drop & DC Power (2,083 s) → RAN Parameter & Drive Test (1,389 s) → NOC Commercial 5G Cutover (868 s) → Mobile Network Operations.SUPPLIERMobile RadioVendorsI2.00 d1Structural Load &RF PermitC/T 1,311 sI1.79 d2Crane Climb & AAUMountC/T 1,504 sI2.57 d3CPRI Fiber Drop &DC PowerC/T 2,083 sI0.79 d4RAN Parameter &Drive TestC/T 1,389 sI0.43 d5NOC Commercial 5GCutoverC/T 868 sI0.50 dCUSTOMERMobile NetworkOperations14 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Structural Load & RF Permit1,311 s5 min95%93.0%428 (2.00 d)17
2. Crane Climb & AAU Mount1,504 s15 min92%95.8%625 (1.79 d)15
3. CPRI Fiber Drop & DC Power2,083 s20 min84%91.0%436 (2.57 d)8
4. RAN Parameter & Drive Test1,389 s5 min95%96.8%211 (0.79 d)16
5. NOC Commercial 5G Cutover868 s2 min99%99.1%16 (0.43 d)30

Key figures

Takt time
1,929 s
Lead time
8.34 d
Value-added time
7,155 s
Process cycle efficiency (PCE)
3.2%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
14 lines
Line capacity per day
8 lines
Bottleneck
CPRI Fiber Drop & DC Power

Reading the bottleneck

The bottleneck is "CPRI Fiber Drop & DC Power": it can process 8 lines per day against a demand of 14 lines, so it falls short of demand by 40.2%. Once downtime and scrap are counted, its cycle time grows from 2,083 s to 2,725 s, against a takt of 1,929 s. The largest loss at this step is equipment downtime (uptime 84%), about 397 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.