Global Enterprise SD-WAN Retail Branch Cutover

Product family: Zero-Touch Multi-Site WAN.

Flow: Dual ISP + LTE Circuits → Circuit Ordering & Ship Kit → Local ISP Termination Test → Zero-Touch VPN Policy Push → Night Maintenance Cutover → Legacy MPLS Decommission → Multi-Branch Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Global Enterprise SD-WAN Retail Branch CutoverSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Dual ISP + LTE Circuits → Circuit Ordering & Ship Kit (437 s) → Local ISP Termination Test (501 s) → Zero-Touch VPN Policy Push (694 s) → Night Maintenance Cutover (463 s) → Legacy MPLS Decommission (289 s) → Multi-Branch Retailers.SUPPLIERDual ISP + LTECircuitsI2.00 d1Circuit Ordering& Ship KitC/T 437 sI1.81 d2Local ISPTermination TestC/T 501 sI2.60 d3Zero-Touch VPNPolicy PushC/T 694 sI0.81 d4Night MaintenanceCutoverC/T 463 sI0.40 d5Legacy MPLSDecommissionC/T 289 sI0.50 dCUSTOMERMulti-BranchRetailers42 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Circuit Ordering & Ship Kit437 s5 min95%93.0%1384 (2.00 d)53
2. Local ISP Termination Test501 s15 min92%95.8%1776 (1.81 d)44
3. Zero-Touch VPN Policy Push694 s20 min84%91.0%13109 (2.60 d)25
4. Night Maintenance Cutover463 s5 min95%96.8%634 (0.81 d)49
5. Legacy MPLS Decommission289 s2 min99%99.1%417 (0.40 d)87

Key figures

Takt time
643 s
Lead time
8.21 d
Value-added time
2,384 s
Process cycle efficiency (PCE)
1.1%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
42 lines
Line capacity per day
25 lines
Bottleneck
Zero-Touch VPN Policy Push

Reading the bottleneck

The bottleneck is "Zero-Touch VPN Policy Push": it can process 25 lines per day against a demand of 42 lines, so it falls short of demand by 39.4%. Once downtime and scrap are counted, its cycle time grows from 694 s to 908 s, against a takt of 643 s. The largest loss at this step is equipment downtime (uptime 84%), about 132 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.