Enterprise SIP Trunk & Regulatory Number Port

Product family: Zero-Drop Voice Porting SLA.

Flow: Donor National Telcos → CSR & Authorized LOA Check → Donor Carrier NPAC Sync Wait → SBC SIP Trunk Load Verification → Exact-Minute Routing Port Cut → Inbound/Outbound Call Matrix → Corporate Call Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Enterprise SIP Trunk & Regulatory Number PortSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Donor National Telcos → CSR & Authorized LOA Check (408 s) → Donor Carrier NPAC Sync Wait (468 s) → SBC SIP Trunk Load Verification (648 s) → Exact-Minute Routing Port Cut (432 s) → Inbound/Outbound Call Matrix (270 s) → Corporate Call Centers.SUPPLIERDonor NationalTelcosI2.00 d1CSR & AuthorizedLOA CheckC/T 408 sI1.80 d2Donor CarrierNPAC Sync WaitC/T 468 sI2.60 d3SBC SIP TrunkLoad VerificationC/T 648 sI0.80 d4Exact-MinuteRouting Port CutC/T 432 sI0.40 d5Inbound/OutboundCall MatrixC/T 270 sI0.51 dCUSTOMERCorporate CallCenters45 / lines

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CSR & Authorized LOA Check408 s5 min95%93.0%1490 (2.00 d)56
2. Donor Carrier NPAC Sync Wait468 s15 min92%95.8%1881 (1.80 d)47
3. SBC SIP Trunk Load Verification648 s20 min84%91.0%14117 (2.60 d)27
4. Exact-Minute Routing Port Cut432 s5 min95%96.8%736 (0.80 d)53
5. Inbound/Outbound Call Matrix270 s2 min99%99.1%518 (0.40 d)94

Key figures

Takt time
600 s
Lead time
8.19 d
Value-added time
2,226 s
Process cycle efficiency (PCE)
1.0%
Rolled throughput yield (RTY)
77.8%
Customer demand per day
45 lines
Line capacity per day
27 lines
Bottleneck
SBC SIP Trunk Load Verification

Reading the bottleneck

The bottleneck is "SBC SIP Trunk Load Verification": it can process 27 lines per day against a demand of 45 lines, so it falls short of demand by 39.3%. Once downtime and scrap are counted, its cycle time grows from 648 s to 848 s, against a takt of 600 s. The largest loss at this step is equipment downtime (uptime 84%), about 123 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Telecom Networks, Fiber FTTH & 5G: Telecom Networks, Fiber FTTH & 5G