Class-II Medical Graduated Compression Stocking

Product family: RAL Medical Hosiery Line.

Flow: Double-Covered Elastane → 4-Feed Circular Gradient Knit → Auto Toe-Linking Seamless → Steam Pre-Board Leg Shaping → MST Pressure-Profile Rig → CE Class-I Pair Packaging → Pharmacies & Ortho Clinics

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Class-II Medical Graduated Compression StockingSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Double-Covered Elastane → 4-Feed Circular Gradient Knit (11.5 s) → Auto Toe-Linking Seamless (13.0 s) → Steam Pre-Board Leg Shaping (19.3 s) → MST Pressure-Profile Rig (14.0 s) → CE Class-I Pair Packaging (10.4 s) → Pharmacies & Ortho Clinics.SUPPLIERDouble-CoveredElastaneI1.60 d14-Feed CircularGradient KnitC/T 11.5 sI1.40 d2Auto Toe-LinkingSeamlessC/T 13.0 sI2.40 d3Steam Pre-BoardLeg ShapingC/T 19.3 sI1.30 d4MSTPressure-Profile…C/T 14.0 sI0.90 d5CE Class-I PairPackagingC/T 10.4 sI1.40 dCUSTOMERPharmacies &Ortho Clinics4,500 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. 4-Feed Circular Gradient Knit11.5 s30 min95%98.8%6,7507,200 (1.60 d)6,513
2. Auto Toe-Linking Seamless13.0 s20 min94%98.2%3,6006,300 (1.40 d)5,645
3. Steam Pre-Board Leg Shaping19.3 s45 min86%93.0%4,50010,800 (2.40 d)3,245
4. MST Pressure-Profile Rig14.0 s15 min92%97.5%2,7005,850 (1.30 d)5,094
5. CE Class-I Pair Packaging10.4 s10 min96%98.5%1,8004,050 (0.90 d)7,228

Key figures

Takt time
18.0 s
Lead time
9.00 d
Value-added time
68.2 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
4,500 units
Line capacity per day
3,245 units
Bottleneck
Steam Pre-Board Leg Shaping

Reading the bottleneck

The bottleneck is "Steam Pre-Board Leg Shaping": it can process 3,245 units per day against a demand of 4,500 units, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 19.3 s to 24.1 s, against a takt of 18.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.