EN-11612 Arc-Flash Flame-Retardant Coverall

Product family: Aramid Industrial Safety Wear.

Flow: Aramid & FR Cotton Supplier → Auto-Cut High-Visibility Strips → Aramid Thread Safety Stitch → Reflective Heat Laminate → Bar-Tack Pocket & Snap Press → Batch Flammability Lot Trace → Oil, Gas & Grid Utilities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EN-11612 Arc-Flash Flame-Retardant CoverallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aramid & FR Cotton Supplier → Auto-Cut High-Visibility Strips (51.0 s) → Aramid Thread Safety Stitch (57.0 s) → Reflective Heat Laminate (85.0 s) → Bar-Tack Pocket & Snap Press (62.0 s) → Batch Flammability Lot Trace (46.0 s) → Oil, Gas & Grid Utilities.SUPPLIERAramid & FRCotton SupplierI1.60 d1Auto-CutHigh-Visibility…C/T 51.0 sI1.40 d2Aramid ThreadSafety StitchC/T 57.0 sI2.40 d3Reflective HeatLaminateC/T 85.0 sI1.30 d4Bar-Tack Pocket &Snap PressC/T 62.0 sI0.90 d5BatchFlammability Lot…C/T 46.0 sI1.40 dCUSTOMEROil, Gas & GridUtilities680 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Auto-Cut High-Visibility Strips51.0 s30 min95%98.8%1,0201,088 (1.60 d)972
2. Aramid Thread Safety Stitch57.0 s20 min94%98.2%544952 (1.40 d)850
3. Reflective Heat Laminate85.0 s45 min86%93.0%6801,632 (2.40 d)483
4. Bar-Tack Pocket & Snap Press62.0 s15 min92%97.5%408884 (1.30 d)760
5. Batch Flammability Lot Trace46.0 s10 min96%98.5%272612 (0.90 d)1,079

Key figures

Takt time
79.4 s
Lead time
9.01 d
Value-added time
301 s
Process cycle efficiency (PCE)
0.062%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
680 garments
Line capacity per day
483 garments
Bottleneck
Reflective Heat Laminate

Reading the bottleneck

The bottleneck is "Reflective Heat Laminate": it can process 483 garments per day against a demand of 680 garments, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 85.0 s to 106 s, against a takt of 79.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 13.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.