Chlorine-Proof Recycled Nylon Bikini & Swim Trunks

Product family: Bonded Laser-Cut Swimwear.

Flow: Recycled Elastane Yarn → Tension-Free Spread & Laser → Ultrasonic Seam & Glue Tape → Elastic Flatlock & Padding → High-Temp Stretch Recovery → Hygiene Liner & Recyclable Box → Summer Resort Retail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Chlorine-Proof Recycled Nylon Bikini & Swim TrunksSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Recycled Elastane Yarn → Tension-Free Spread & Laser (16.5 s) → Ultrasonic Seam & Glue Tape (18.5 s) → Elastic Flatlock & Padding (27.5 s) → High-Temp Stretch Recovery (20.1 s) → Hygiene Liner & Recyclable Box (14.9 s) → Summer Resort Retail.SUPPLIERRecycledElastane YarnI1.60 d1Tension-FreeSpread & LaserC/T 16.5 sI1.40 d2Ultrasonic Seam &Glue TapeC/T 18.5 sI2.40 d3Elastic Flatlock& PaddingC/T 27.5 sI1.30 d4High-Temp StretchRecoveryC/T 20.1 sI0.90 d5Hygiene Liner &Recyclable BoxC/T 14.9 sI1.40 dCUSTOMERSummer ResortRetail2,100 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tension-Free Spread & Laser16.5 s30 min95%98.8%3,1503,360 (1.60 d)3,004
2. Ultrasonic Seam & Glue Tape18.5 s20 min94%98.2%1,6802,940 (1.40 d)2,620
3. Elastic Flatlock & Padding27.5 s45 min86%93.0%2,1005,040 (2.40 d)1,492
4. High-Temp Stretch Recovery20.1 s15 min92%97.5%1,2602,730 (1.30 d)2,343
5. Hygiene Liner & Recyclable Box14.9 s10 min96%98.5%8401,890 (0.90 d)3,332

Key figures

Takt time
25.7 s
Lead time
9.00 d
Value-added time
97.5 s
Process cycle efficiency (PCE)
0.020%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
2,100 garments
Line capacity per day
1,492 garments
Bottleneck
Elastic Flatlock & Padding

Reading the bottleneck

The bottleneck is "Elastic Flatlock & Padding": it can process 1,492 garments per day against a demand of 2,100 garments, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 27.5 s to 34.4 s, against a takt of 25.7 s. The largest loss at this step is equipment downtime (uptime 86%), about 4.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Apparel Cut-Make-Trim & Footwear: Apparel Cut-Make-Trim & Footwear