Bespoke Tailored Men’s Merino Wool Suit Line

Product family: Half-Canvas Tailored Blazers.

Flow: Biella Super-130s Wool → Laser Single-Ply Plaid Match → Floating Horsehair Chest Fuse → Precision Sleeve & Collar Set → Steam Shape Press → Garment Bag Hangar Dispatch → Luxury Menswear Stores

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Bespoke Tailored Men’s Merino Wool Suit LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Biella Super-130s Wool → Laser Single-Ply Plaid Match (54.0 s) → Floating Horsehair Chest Fuse (61.0 s) → Precision Sleeve & Collar Set (90.0 s) → Steam Shape Press (66.0 s) → Garment Bag Hangar Dispatch (49.0 s) → Luxury Menswear Stores.SUPPLIERBiellaSuper-130s WoolI1.60 d1Laser Single-PlyPlaid MatchC/T 54.0 sI1.40 d2FloatingHorsehair Chest…C/T 61.0 sI2.40 d3Precision Sleeve& Collar SetC/T 90.0 sI1.30 d4Steam Shape PressC/T 66.0 sI0.90 d5Garment BagHangar DispatchC/T 49.0 sI1.40 dCUSTOMERLuxury MenswearStores320 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Laser Single-Ply Plaid Match54.0 s30 min95%98.8%480512 (1.60 d)448
2. Floating Horsehair Chest Fuse61.0 s20 min94%98.2%256448 (1.40 d)386
3. Precision Sleeve & Collar Set90.0 s45 min86%93.0%320768 (2.40 d)216
4. Steam Shape Press66.0 s15 min92%97.5%192416 (1.30 d)347
5. Garment Bag Hangar Dispatch49.0 s10 min96%98.5%128288 (0.90 d)492

Key figures

Takt time
84.4 s
Lead time
9.01 d
Value-added time
320 s
Process cycle efficiency (PCE)
0.13%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
320 garments
Line capacity per day
216 garments
Bottleneck
Precision Sleeve & Collar Set

Reading the bottleneck

The bottleneck is "Precision Sleeve & Collar Set": it can process 216 garments per day against a demand of 320 garments, so it falls short of demand by 32.5%. Once downtime and scrap are counted, its cycle time grows from 90.0 s to 113 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 14.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Apparel Cut-Make-Trim & Footwear: Apparel Cut-Make-Trim & Footwear