Bespoke Tailored Men’s Merino Wool Suit Line
Product family: Half-Canvas Tailored Blazers.
Flow: Biella Super-130s Wool → Laser Single-Ply Plaid Match → Floating Horsehair Chest Fuse → Precision Sleeve & Collar Set → Steam Shape Press → Garment Bag Hangar Dispatch → Luxury Menswear Stores
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Laser Single-Ply Plaid Match | 54.0 s | 30 min | 95% | 98.8% | 480 | 512 (1.60 d) | 448 |
| 2. Floating Horsehair Chest Fuse | 61.0 s | 20 min | 94% | 98.2% | 256 | 448 (1.40 d) | 386 |
| 3. Precision Sleeve & Collar Set | 90.0 s | 45 min | 86% | 93.0% | 320 | 768 (2.40 d) | 216 |
| 4. Steam Shape Press | 66.0 s | 15 min | 92% | 97.5% | 192 | 416 (1.30 d) | 347 |
| 5. Garment Bag Hangar Dispatch | 49.0 s | 10 min | 96% | 98.5% | 128 | 288 (0.90 d) | 492 |
Key figures
- Takt time
- 84.4 s
- Lead time
- 9.01 d
- Value-added time
- 320 s
- Process cycle efficiency (PCE)
- 0.13%
- Rolled throughput yield (RTY)
- 86.7%
- Customer demand per day
- 320 garments
- Line capacity per day
- 216 garments
- Bottleneck
- Precision Sleeve & Collar Set
Reading the bottleneck
The bottleneck is "Precision Sleeve & Collar Set": it can process 216 garments per day against a demand of 320 garments, so it falls short of demand by 32.5%. Once downtime and scrap are counted, its cycle time grows from 90.0 s to 113 s, against a takt of 84.4 s. The largest loss at this step is equipment downtime (uptime 86%), about 14.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Apparel Cut-Make-Trim & Footwear: Apparel Cut-Make-Trim & Footwear
- Apparel Cut-Make-Trim (CMT) Garment Line
- Ozone & Laser Distressed Denim Jeans Line
- Seamless Circular Activewear Line
- EN-11612 Arc-Flash Flame-Retardant Coverall
- Direct-Injected PU/TPU Knit Running Shoe Line
- Structured Full-Grain Calfskin Handbag Atelier
- S3 Composite-Toe PU Direct-Injection Work Boot
- Class-II Medical Graduated Compression Stocking
- Chlorine-Proof Recycled Nylon Bikini & Swim Trunks
- Baffle-Filled 800-Fill RDS Down Puffer Parka
- Custom Sports Club Dye-Sublimation Jersey Line