Direct-Injected PU/TPU Knit Running Shoe Line

Product family: 3D Knit Athletic Trainers.

Flow: 3D Engineered Knit Vamps → Computerized 3D Upper Knit → Hot-Melt No-Sew TPU Overlay → Automated Board Lasting → Elastomer Foam Midsole Bond → Peel Force Test & Shoebox → Sportswear Global Hubs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Direct-Injected PU/TPU Knit Running Shoe LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 3D Engineered Knit Vamps → Computerized 3D Upper Knit (19.2 s) → Hot-Melt No-Sew TPU Overlay (21.6 s) → Automated Board Lasting (32.1 s) → Elastomer Foam Midsole Bond (23.4 s) → Peel Force Test & Shoebox (17.4 s) → Sportswear Global Hubs.SUPPLIER3D EngineeredKnit VampsI1.60 d1Computerized 3DUpper KnitC/T 19.2 sI1.40 d2Hot-Melt No-SewTPU OverlayC/T 21.6 sI2.40 d3Automated BoardLastingC/T 32.1 sI1.30 d4Elastomer FoamMidsole BondC/T 23.4 sI0.90 d5Peel Force Test &ShoeboxC/T 17.4 sI1.40 dCUSTOMERSportswearGlobal Hubs1,800 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Computerized 3D Upper Knit19.2 s30 min95%98.8%2,7002,880 (1.60 d)2,581
2. Hot-Melt No-Sew TPU Overlay21.6 s20 min94%98.2%1,4402,520 (1.40 d)2,244
3. Automated Board Lasting32.1 s45 min86%93.0%1,8004,320 (2.40 d)1,278
4. Elastomer Foam Midsole Bond23.4 s15 min92%97.5%1,0802,340 (1.30 d)2,013
5. Peel Force Test & Shoebox17.4 s10 min96%98.5%7201,620 (0.90 d)2,853

Key figures

Takt time
30.0 s
Lead time
9.00 d
Value-added time
114 s
Process cycle efficiency (PCE)
0.023%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
1,800 units
Line capacity per day
1,278 units
Bottleneck
Automated Board Lasting

Reading the bottleneck

The bottleneck is "Automated Board Lasting": it can process 1,278 units per day against a demand of 1,800 units, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 32.1 s to 40.1 s, against a takt of 30.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 5.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.