Apparel Cut-Make-Trim (CMT) Garment Line

Product family: Technical Outerwear Jackets.

Flow: Mediterranean Textile Mills → CAD Spread & Auto-Cut → Fusing & Seam Prep → Progressive Sewing Line → Steam Press & Wash → AQL Audit & Polybag → European Fashion Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Apparel Cut-Make-Trim (CMT) Garment LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mediterranean Textile Mills → CAD Spread & Auto-Cut (23.0 s) → Fusing & Seam Prep (25.9 s) → Progressive Sewing Line (38.5 s) → Steam Press & Wash (28.1 s) → AQL Audit & Polybag (20.9 s) → European Fashion Brands.SUPPLIERMediterraneanTextile MillsI1.60 d1CAD Spread &Auto-CutC/T 23.0 sI1.40 d2Fusing & SeamPrepC/T 25.9 sI2.40 d3ProgressiveSewing LineC/T 38.5 sI1.30 d4Steam Press &WashC/T 28.1 sI0.90 d5AQL Audit &PolybagC/T 20.9 sI1.40 dCUSTOMEREuropeanFashion Brands1,500 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. CAD Spread & Auto-Cut23.0 s30 min95%98.8%2,2502,400 (1.60 d)2,155
2. Fusing & Seam Prep25.9 s20 min94%98.2%1,2002,100 (1.40 d)1,871
3. Progressive Sewing Line38.5 s45 min86%93.0%1,5003,600 (2.40 d)1,066
4. Steam Press & Wash28.1 s15 min92%97.5%9001,950 (1.30 d)1,676
5. AQL Audit & Polybag20.9 s10 min96%98.5%6001,350 (0.90 d)2,375

Key figures

Takt time
36.0 s
Lead time
9.00 d
Value-added time
136 s
Process cycle efficiency (PCE)
0.028%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
1,500 garments
Line capacity per day
1,066 garments
Bottleneck
Progressive Sewing Line

Reading the bottleneck

The bottleneck is "Progressive Sewing Line": it can process 1,066 garments per day against a demand of 1,500 garments, so it falls short of demand by 29.0%. Once downtime and scrap are counted, its cycle time grows from 38.5 s to 48.1 s, against a takt of 36.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 6.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.