Seamless Circular Activewear Line

Product family: 3D Knit Compression Leggings.

Flow: Recycled Nylon Yarn → Circular Tube Knit → Automatic Gusset Flatlock → Low-Bath Garment Dyeing → Heat Transfer Size Stamp → Laser Fold & Recycled Bag → Athleisure D2C Brands

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Seamless Circular Activewear LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Recycled Nylon Yarn → Circular Tube Knit (13.6 s) → Automatic Gusset Flatlock (15.3 s) → Low-Bath Garment Dyeing (22.8 s) → Heat Transfer Size Stamp (16.6 s) → Laser Fold & Recycled Bag (12.4 s) → Athleisure D2C Brands.SUPPLIERRecycled NylonYarnI1.60 d1Circular TubeKnitC/T 13.6 sI1.40 d2Automatic GussetFlatlockC/T 15.3 sI2.40 d3Low-Bath GarmentDyeingC/T 22.8 sI1.30 d4Heat TransferSize StampC/T 16.6 sI0.90 d5Laser Fold &Recycled BagC/T 12.4 sI1.40 dCUSTOMERAthleisure D2CBrands3,800 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Circular Tube Knit13.6 s30 min95%98.8%5,7006,080 (1.60 d)5,507
2. Automatic Gusset Flatlock15.3 s20 min94%98.2%3,0405,320 (1.40 d)4,796
3. Low-Bath Garment Dyeing22.8 s45 min86%93.0%3,8009,120 (2.40 d)2,747
4. Heat Transfer Size Stamp16.6 s15 min92%97.5%2,2804,940 (1.30 d)4,296
5. Laser Fold & Recycled Bag12.4 s10 min96%98.5%1,5203,420 (0.90 d)6,063

Key figures

Takt time
21.3 s
Lead time
9.00 d
Value-added time
80.7 s
Process cycle efficiency (PCE)
0.011%
Rolled throughput yield (RTY)
86.7%
Customer demand per day
3,800 garments
Line capacity per day
2,747 garments
Bottleneck
Low-Bath Garment Dyeing

Reading the bottleneck

The bottleneck is "Low-Bath Garment Dyeing": it can process 2,747 garments per day against a demand of 3,800 garments, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 22.8 s to 28.5 s, against a takt of 21.3 s. The largest loss at this step is equipment downtime (uptime 86%), about 3.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.