2500-Bar Heavy Diesel Common-Rail Pump
Product family: 3-Plunger High-Pressure Pumps.
Flow: Bearing-steel forge → Camshaft CBN Form Grind → Sub-Micron Plunger Honing → Vacuum Brazed Check Valve → Clean Assembly Bench → 2500-Bar Pulsation Test → Off-Highway & Marine OEM
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Camshaft CBN Form Grind | 82.0 s | 35 min | 94% | 98.8% | 460 | 920 (2.00 d) | 588 |
| 2. Sub-Micron Plunger Honing | 100 s | 50 min | 89% | 96.5% | 460 | 1,012 (2.20 d) | 438 |
| 3. Vacuum Brazed Check Valve | 126 s | 40 min | 84% | 95.2% | 230 | 1,104 (2.40 d) | 312 |
| 4. Clean Assembly Bench | 94.0 s | 30 min | 91% | 97.1% | 460 | 690 (1.50 d) | 491 |
| 5. 2500-Bar Pulsation Test | 68.0 s | 10 min | 96% | 98.9% | 115 | 414 (0.90 d) | 720 |
Key figures
- Takt time
- 117 s
- Lead time
- 11.0 d
- Value-added time
- 470 s
- Process cycle efficiency (PCE)
- 0.079%
- Rolled throughput yield (RTY)
- 87.2%
- Customer demand per day
- 460 units
- Line capacity per day
- 312 units
- Bottleneck
- Vacuum Brazed Check Valve
Reading the bottleneck
The bottleneck is "Vacuum Brazed Check Valve": it can process 312 units per day against a demand of 460 units, so it falls short of demand by 32.1%. Once downtime and scrap are counted, its cycle time grows from 126 s to 158 s, against a takt of 117 s. The largest loss at this step is equipment downtime (uptime 84%), about 24.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Trucks, Bus & Rail: Commercial Trucks, Bus & Rail
- Class-8 Long-Haul Sleeper Cab Body & Trim
- 12m Low-Floor Electric Transit Bus Build
- High-Speed Passenger Rail Bogie Assembly
- Plug-Sliding Pneumatic Metro Car Door
- Heavy Truck EBS Electronic Brake Valve
- 40ft Curtain-Sider Semi-Trailer Frame
- CVT Continuous Agricultural Tractor Gearbox
- 3-Stage Triplex Tele-Mast Warehouse Forklift
- 24-Ton Excavator Articulated Boom & Stick
- Municipal Aerial Ladder Fire Apparatus Body
- 5-Piece Off-The-Road Mining Haul Truck Rim