High-Speed Passenger Rail Bogie Assembly
Product family: 320 km/h Welded Train Bogies.
Flow: Wheelset forging supplier → Box-Section Sub-Arc Weld → UT Weld & Stress-Relief → Gantry Bore & Wheel Press → Primary Spring & Damper Rig → 120kN Static Load Leveling → Rolling Stock Final Plant
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Box-Section Sub-Arc Weld | 2,100 s | 35 min | 94% | 98.8% | 18 | 36 (2.00 d) | 23 |
| 2. UT Weld & Stress-Relief | 2,550 s | 50 min | 89% | 96.5% | 18 | 40 (2.22 d) | 17 |
| 3. Gantry Bore & Wheel Press | 3,210 s | 40 min | 84% | 95.2% | 9 | 43 (2.39 d) | 12 |
| 4. Primary Spring & Damper Rig | 2,400 s | 30 min | 91% | 97.1% | 18 | 27 (1.50 d) | 19 |
| 5. 120kN Static Load Leveling | 1,740 s | 10 min | 96% | 98.9% | 5 | 16 (0.89 d) | 28 |
Key figures
- Takt time
- 3,000 s
- Lead time
- 11.2 d
- Value-added time
- 12,000 s
- Process cycle efficiency (PCE)
- 2.0%
- Rolled throughput yield (RTY)
- 87.2%
- Customer demand per day
- 18 assemblies
- Line capacity per day
- 12 assemblies
- Bottleneck
- Gantry Bore & Wheel Press
Reading the bottleneck
The bottleneck is "Gantry Bore & Wheel Press": it can process 12 assemblies per day against a demand of 18 assemblies, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 3,210 s to 4,014 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 611 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Commercial Trucks, Bus & Rail: Commercial Trucks, Bus & Rail
- Class-8 Long-Haul Sleeper Cab Body & Trim
- 12m Low-Floor Electric Transit Bus Build
- Plug-Sliding Pneumatic Metro Car Door
- Heavy Truck EBS Electronic Brake Valve
- 40ft Curtain-Sider Semi-Trailer Frame
- CVT Continuous Agricultural Tractor Gearbox
- 3-Stage Triplex Tele-Mast Warehouse Forklift
- 24-Ton Excavator Articulated Boom & Stick
- 2500-Bar Heavy Diesel Common-Rail Pump
- Municipal Aerial Ladder Fire Apparatus Body
- 5-Piece Off-The-Road Mining Haul Truck Rim