High-Speed Passenger Rail Bogie Assembly

Product family: 320 km/h Welded Train Bogies.

Flow: Wheelset forging supplier → Box-Section Sub-Arc Weld → UT Weld & Stress-Relief → Gantry Bore & Wheel Press → Primary Spring & Damper Rig → 120kN Static Load Leveling → Rolling Stock Final Plant

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Speed Passenger Rail Bogie AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wheelset forging supplier → Box-Section Sub-Arc Weld (2,100 s) → UT Weld & Stress-Relief (2,550 s) → Gantry Bore & Wheel Press (3,210 s) → Primary Spring & Damper Rig (2,400 s) → 120kN Static Load Leveling (1,740 s) → Rolling Stock Final Plant.SUPPLIERWheelsetforgingsupplierI2.00 d1Box-SectionSub-Arc WeldC/T 2,100 sI2.22 d2UT Weld &Stress-ReliefC/T 2,550 sI2.39 d3Gantry Bore &Wheel PressC/T 3,210 sI1.50 d4Primary Spring &Damper RigC/T 2,400 sI0.89 d5120kN Static LoadLevelingC/T 1,740 sI2.00 dCUSTOMERRolling StockFinal Plant18 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Box-Section Sub-Arc Weld2,100 s35 min94%98.8%1836 (2.00 d)23
2. UT Weld & Stress-Relief2,550 s50 min89%96.5%1840 (2.22 d)17
3. Gantry Bore & Wheel Press3,210 s40 min84%95.2%943 (2.39 d)12
4. Primary Spring & Damper Rig2,400 s30 min91%97.1%1827 (1.50 d)19
5. 120kN Static Load Leveling1,740 s10 min96%98.9%516 (0.89 d)28

Key figures

Takt time
3,000 s
Lead time
11.2 d
Value-added time
12,000 s
Process cycle efficiency (PCE)
2.0%
Rolled throughput yield (RTY)
87.2%
Customer demand per day
18 assemblies
Line capacity per day
12 assemblies
Bottleneck
Gantry Bore & Wheel Press

Reading the bottleneck

The bottleneck is "Gantry Bore & Wheel Press": it can process 12 assemblies per day against a demand of 18 assemblies, so it falls short of demand by 31.9%. Once downtime and scrap are counted, its cycle time grows from 3,210 s to 4,014 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 611 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.