3-Stage Triplex Tele-Mast Warehouse Forklift

Product family: 6m Reach Electric Mast Modules.

Flow: Steel profile supplier → Channel Cut & Guide Weld → Roller Shim & Lift Ram Fit → Cascade Side-Shift Plumb → Lift Chain Pre-Tension Rig → 3.5T Rated Load Drift Check → Warehouse Forklift Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 3-Stage Triplex Tele-Mast Warehouse ForkliftSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Steel profile supplier → Channel Cut & Guide Weld (270 s) → Roller Shim & Lift Ram Fit (328 s) → Cascade Side-Shift Plumb (413 s) → Lift Chain Pre-Tension Rig (309 s) → 3.5T Rated Load Drift Check (224 s) → Warehouse Forklift Line.SUPPLIERSteel profilesupplierI2.00 d1Channel Cut &Guide WeldC/T 270 sI2.20 d2Roller Shim &Lift Ram FitC/T 328 sI2.40 d3CascadeSide-Shift PlumbC/T 413 sI1.50 d4Lift ChainPre-Tension RigC/T 309 sI0.90 d53.5T Rated LoadDrift CheckC/T 224 sI2.00 dCUSTOMERWarehouseForklift Line140 / assemblies

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Channel Cut & Guide Weld270 s35 min94%98.8%140280 (2.00 d)179
2. Roller Shim & Lift Ram Fit328 s50 min89%96.5%140308 (2.20 d)134
3. Cascade Side-Shift Plumb413 s40 min84%95.2%70336 (2.40 d)95
4. Lift Chain Pre-Tension Rig309 s30 min91%97.1%140210 (1.50 d)149
5. 3.5T Rated Load Drift Check224 s10 min96%98.9%35126 (0.90 d)219

Key figures

Takt time
386 s
Lead time
11.0 d
Value-added time
1,544 s
Process cycle efficiency (PCE)
0.26%
Rolled throughput yield (RTY)
87.2%
Customer demand per day
140 assemblies
Line capacity per day
95 assemblies
Bottleneck
Cascade Side-Shift Plumb

Reading the bottleneck

The bottleneck is "Cascade Side-Shift Plumb": it can process 95 assemblies per day against a demand of 140 assemblies, so it falls short of demand by 32.0%. Once downtime and scrap are counted, its cycle time grows from 413 s to 516 s, against a takt of 386 s. The largest loss at this step is equipment downtime (uptime 84%), about 78.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.