Plug-Sliding Pneumatic Metro Car Door

Product family: SIL-2 Passenger Access Systems.

Flow: Rail door-drive motor supplier → Al Extrusion CNC Mitre → Door Leaf Epoxy Bond Press → Linear Screw & Drive Beam → Obstacle Detection Calibration → 500-Cycle Endurance Gate Rig → Metro Train Builders

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Plug-Sliding Pneumatic Metro Car DoorSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Rail door-drive motor supplier → Al Extrusion CNC Mitre (398 s) → Door Leaf Epoxy Bond Press (483 s) → Linear Screw & Drive Beam (608 s) → Obstacle Detection Calibration (455 s) → 500-Cycle Endurance Gate Rig (330 s) → Metro Train Builders.SUPPLIERRail door-drivemotor supplierI2.00 d1Al Extrusion CNCMitreC/T 398 sI2.20 d2Door Leaf EpoxyBond PressC/T 483 sI2.40 d3Linear Screw &Drive BeamC/T 608 sI1.51 d4ObstacleDetection…C/T 455 sI0.91 d5500-CycleEndurance Gate…C/T 330 sI2.00 dCUSTOMERMetro TrainBuilders95 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Al Extrusion CNC Mitre398 s35 min94%98.8%95190 (2.00 d)121
2. Door Leaf Epoxy Bond Press483 s50 min89%96.5%95209 (2.20 d)91
3. Linear Screw & Drive Beam608 s40 min84%95.2%48228 (2.40 d)65
4. Obstacle Detection Calibration455 s30 min91%97.1%95143 (1.51 d)101
5. 500-Cycle Endurance Gate Rig330 s10 min96%98.9%2486 (0.91 d)149

Key figures

Takt time
568 s
Lead time
11.1 d
Value-added time
2,274 s
Process cycle efficiency (PCE)
0.38%
Rolled throughput yield (RTY)
87.2%
Customer demand per day
95 units
Line capacity per day
65 units
Bottleneck
Linear Screw & Drive Beam

Reading the bottleneck

The bottleneck is "Linear Screw & Drive Beam": it can process 65 units per day against a demand of 95 units, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 608 s to 760 s, against a takt of 568 s. The largest loss at this step is equipment downtime (uptime 84%), about 116 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.