48V Belt-Starter & Lithium Sub-Pack
Product family: 48V MHEV Auxiliary Module.
Flow: Motor & cell supplier → Cell Grading & IR Match → Nickel Strip Spot Weld → BMS Bolt & Potted Shell → 48V Bus Active Pre-Charge → Cycle Pulse Load Verify → Hybrid Powertrain Line
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Cell Grading & IR Match | 54.0 s | 55 min | 92% | 97.8% | 740 | 1,110 (1.50 d) | 845 |
| 2. Nickel Strip Spot Weld | 62.0 s | 30 min | 91% | 96.9% | 444 | 1,036 (1.40 d) | 725 |
| 3. BMS Bolt & Potted Shell | 80.0 s | 20 min | 84% | 94.5% | 888 | 2,072 (2.80 d) | 526 |
| 4. 48V Bus Active Pre-Charge | 57.0 s | 18 min | 93% | 98.2% | 222 | 740 (1.00 d) | 808 |
| 5. Cycle Pulse Load Verify | 44.0 s | 12 min | 96% | 99.3% | 111 | 518 (0.70 d) | 1,066 |
Key figures
- Takt time
- 73.0 s
- Lead time
- 8.61 d
- Value-added time
- 297 s
- Process cycle efficiency (PCE)
- 0.064%
- Rolled throughput yield (RTY)
- 87.3%
- Customer demand per day
- 740 units
- Line capacity per day
- 526 units
- Bottleneck
- BMS Bolt & Potted Shell
Reading the bottleneck
The bottleneck is "BMS Bolt & Potted Shell": it can process 526 units per day against a demand of 740 units, so it falls short of demand by 28.9%. Once downtime and scrap are counted, its cycle time grows from 80.0 s to 101 s, against a takt of 73.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 15.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of EV Batteries & E-Powertrain: EV Batteries & E-Powertrain
- High-Nickel NMC Prismatic Cell Line
- LFP Cell-to-Pack (CTP) Blade Line
- Vacuum-Brazed Aluminum Battery Cold Plate
- Shielded 800V Orange HV Cable Harness
- 22kW Bi-Directional On-Board Charger
- Automotive ASIL-D Battery Management Controller
- 3kW 800V-to-12V DC-DC Step-Down Unit
- Dual-Standard CCS2 / NACS Motorized Inlet
- High-Voltage Pyrotechnic Safety Fuse
- Solid-State Oxide Electrolyte Pilot Line
- Standardized Battery-Swap Pack Station