3kW 800V-to-12V DC-DC Step-Down Unit
Product family: Isolated EV Auxiliary Converter.
Flow: Ferrite & power-chip supplier → Die-Cast Heat-Sink Mill → Power Stage SMT Paste → Gap-Pad & Case Torque → ESS Thermal Cycle Shock → Efficiency Curve EOL Sweep → BEV Electrical Architecture
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Die-Cast Heat-Sink Mill | 42.0 s | 55 min | 92% | 97.8% | 950 | 1,425 (1.50 d) | 1,086 |
| 2. Power Stage SMT Paste | 48.0 s | 30 min | 91% | 96.9% | 570 | 1,330 (1.40 d) | 937 |
| 3. Gap-Pad & Case Torque | 63.0 s | 20 min | 84% | 94.5% | 1,140 | 2,660 (2.80 d) | 668 |
| 4. ESS Thermal Cycle Shock | 44.0 s | 18 min | 93% | 98.2% | 285 | 950 (1.00 d) | 1,046 |
| 5. Efficiency Curve EOL Sweep | 34.1 s | 12 min | 96% | 99.3% | 143 | 665 (0.70 d) | 1,376 |
Key figures
- Takt time
- 56.8 s
- Lead time
- 8.60 d
- Value-added time
- 231 s
- Process cycle efficiency (PCE)
- 0.050%
- Rolled throughput yield (RTY)
- 87.3%
- Customer demand per day
- 950 units
- Line capacity per day
- 668 units
- Bottleneck
- Gap-Pad & Case Torque
Reading the bottleneck
The bottleneck is "Gap-Pad & Case Torque": it can process 668 units per day against a demand of 950 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 63.0 s to 79.4 s, against a takt of 56.8 s. The largest loss at this step is equipment downtime (uptime 84%), about 12.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of EV Batteries & E-Powertrain: EV Batteries & E-Powertrain
- High-Nickel NMC Prismatic Cell Line
- LFP Cell-to-Pack (CTP) Blade Line
- Vacuum-Brazed Aluminum Battery Cold Plate
- Shielded 800V Orange HV Cable Harness
- 22kW Bi-Directional On-Board Charger
- Automotive ASIL-D Battery Management Controller
- Dual-Standard CCS2 / NACS Motorized Inlet
- High-Voltage Pyrotechnic Safety Fuse
- 48V Belt-Starter & Lithium Sub-Pack
- Solid-State Oxide Electrolyte Pilot Line
- Standardized Battery-Swap Pack Station