Standardized Battery-Swap Pack Station

Product family: Quick-Lock 75kWh Swap Packs.

Flow: Battery Tier-1 suppliers → Quick-Lock Coupler CNC → Drip-Free Fluid Valve Mate → Laser Module Weld & Frame → Automated Swap Rig Latches → 50-Cycle Quick-Swap Stress → Swap Station Network

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Standardized Battery-Swap Pack StationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Battery Tier-1 suppliers → Quick-Lock Coupler CNC (250 s) → Drip-Free Fluid Valve Mate (287 s) → Laser Module Weld & Frame (371 s) → Automated Swap Rig Latches (263 s) → 50-Cycle Quick-Swap Stress (203 s) → Swap Station Network.SUPPLIERBattery Tier-1suppliersI1.50 d1Quick-LockCoupler CNCC/T 250 sI1.40 d2Drip-Free FluidValve MateC/T 287 sI2.80 d3Laser Module Weld& FrameC/T 371 sI1.00 d4Automated SwapRig LatchesC/T 263 sI0.70 d550-CycleQuick-Swap StressC/T 203 sI1.20 dCUSTOMERSwap StationNetwork160 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Quick-Lock Coupler CNC250 s55 min92%97.8%160240 (1.50 d)182
2. Drip-Free Fluid Valve Mate287 s30 min91%96.9%96224 (1.40 d)157
3. Laser Module Weld & Frame371 s20 min84%94.5%192448 (2.80 d)113
4. Automated Swap Rig Latches263 s18 min93%98.2%48160 (1.00 d)175
5. 50-Cycle Quick-Swap Stress203 s12 min96%99.3%24112 (0.70 d)231

Key figures

Takt time
338 s
Lead time
8.63 d
Value-added time
1,374 s
Process cycle efficiency (PCE)
0.29%
Rolled throughput yield (RTY)
87.3%
Customer demand per day
160 packs
Line capacity per day
113 packs
Bottleneck
Laser Module Weld & Frame

Reading the bottleneck

The bottleneck is "Laser Module Weld & Frame": it can process 113 packs per day against a demand of 160 packs, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 371 s to 467 s, against a takt of 338 s. The largest loss at this step is equipment downtime (uptime 84%), about 70.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.