Vacuum-Brazed Aluminum Battery Cold Plate

Product family: Serpentine Thermal Cold Plates.

Flow: Clad brazing-sheet supplier → Serpentine Stamping Press → Flux Spray & Core Clamping → CAB Nitrogen Brazing Furnace → Pressure Decay & Burst Test → CNC Port Mill & Flatness QC → BEV Battery Tier-1

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Vacuum-Brazed Aluminum Battery Cold PlateSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Clad brazing-sheet supplier → Serpentine Stamping Press (36.3 s) → Flux Spray & Core Clamping (42.0 s) → CAB Nitrogen Brazing Furnace (54.0 s) → Pressure Decay & Burst Test (38.3 s) → CNC Port Mill & Flatness QC (29.5 s) → BEV Battery Tier-1.SUPPLIERCladbrazing-sheetsupplierI1.50 d1SerpentineStamping PressC/T 36.3 sI1.40 d2Flux Spray & CoreClampingC/T 42.0 sI2.80 d3CAB NitrogenBrazing FurnaceC/T 54.0 sI1.00 d4Pressure Decay &Burst TestC/T 38.3 sI0.70 d5CNC Port Mill &Flatness QCC/T 29.5 sI1.20 dCUSTOMERBEV BatteryTier-11,100 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Serpentine Stamping Press36.3 s55 min92%97.8%1,1001,650 (1.50 d)1,257
2. Flux Spray & Core Clamping42.0 s30 min91%96.9%6601,540 (1.40 d)1,071
3. CAB Nitrogen Brazing Furnace54.0 s20 min84%94.5%1,3203,080 (2.80 d)779
4. Pressure Decay & Burst Test38.3 s18 min93%98.2%3301,100 (1.00 d)1,202
5. CNC Port Mill & Flatness QC29.5 s12 min96%99.3%165770 (0.70 d)1,590

Key figures

Takt time
49.1 s
Lead time
8.60 d
Value-added time
200 s
Process cycle efficiency (PCE)
0.043%
Rolled throughput yield (RTY)
87.3%
Customer demand per day
1,100 parts
Line capacity per day
779 parts
Bottleneck
CAB Nitrogen Brazing Furnace

Reading the bottleneck

The bottleneck is "CAB Nitrogen Brazing Furnace": it can process 779 parts per day against a demand of 1,100 parts, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 54.0 s to 68.0 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 10.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.