High-Voltage Pyrotechnic Safety Fuse

Product family: 800V Pyro-Disconnect Switches.

Flow: Ceramic fuse & initiator supplier → Copper Busbar Punch → Pyro Squib Crimping & Seal → Arc-Quench Sand Fill & Laser → Micro-Ohm Resistance Scan → X-Ray Squib Bridge Verify → Battery Disconnect Units

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: High-Voltage Pyrotechnic Safety FuseSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Ceramic fuse & initiator supplier → Copper Busbar Punch (21.4 s) → Pyro Squib Crimping & Seal (24.6 s) → Arc-Quench Sand Fill & Laser (31.8 s) → Micro-Ohm Resistance Scan (22.6 s) → X-Ray Squib Bridge Verify (17.4 s) → Battery Disconnect Units.SUPPLIERCeramic fuse &initiatorsupplierI1.50 d1Copper BusbarPunchC/T 21.4 sI1.40 d2Pyro SquibCrimping & SealC/T 24.6 sI2.80 d3Arc-Quench SandFill & LaserC/T 31.8 sI1.00 d4Micro-OhmResistance ScanC/T 22.6 sI0.70 d5X-Ray SquibBridge VerifyC/T 17.4 sI1.20 dCUSTOMERBatteryDisconnect…2,800 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Copper Busbar Punch21.4 s55 min92%97.8%2,8004,200 (1.50 d)3,267
2. Pyro Squib Crimping & Seal24.6 s30 min91%96.9%1,6803,920 (1.40 d)2,796
3. Arc-Quench Sand Fill & Laser31.8 s20 min84%94.5%3,3607,840 (2.80 d)1,997
4. Micro-Ohm Resistance Scan22.6 s18 min93%98.2%8402,800 (1.00 d)3,128
5. X-Ray Squib Bridge Verify17.4 s12 min96%99.3%4201,960 (0.70 d)4,175

Key figures

Takt time
28.9 s
Lead time
8.60 d
Value-added time
118 s
Process cycle efficiency (PCE)
0.017%
Rolled throughput yield (RTY)
87.3%
Customer demand per day
2,800 parts
Line capacity per day
1,997 parts
Bottleneck
Arc-Quench Sand Fill & Laser

Reading the bottleneck

The bottleneck is "Arc-Quench Sand Fill & Laser": it can process 1,997 parts per day against a demand of 2,800 parts, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 31.8 s to 40.1 s, against a takt of 28.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 6.1 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.