Automotive ASIL-D Battery Management Controller
Product family: Master-Slave BMS Modules.
Flow: Automotive MCU & analog-chip supplier → Fine-Pitch SMT & AOI → Conformal Silicone Coat → Press-Fit Iso-Connector → Flashing & HIL Fault Inject → Cell Simulator Voltage Calib → EV Battery Pack Line
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Fine-Pitch SMT & AOI | 22.2 s | 55 min | 92% | 97.8% | 1,800 | 2,700 (1.50 d) | 2,055 |
| 2. Conformal Silicone Coat | 25.5 s | 30 min | 91% | 96.9% | 1,080 | 2,520 (1.40 d) | 1,764 |
| 3. Press-Fit Iso-Connector | 33.0 s | 20 min | 84% | 94.5% | 2,160 | 5,040 (2.80 d) | 1,275 |
| 4. Flashing & HIL Fault Inject | 23.4 s | 18 min | 93% | 98.2% | 540 | 1,800 (1.00 d) | 1,967 |
| 5. Cell Simulator Voltage Calib | 18.0 s | 12 min | 96% | 99.3% | 270 | 1,260 (0.70 d) | 2,606 |
Key figures
- Takt time
- 30.0 s
- Lead time
- 8.60 d
- Value-added time
- 122 s
- Process cycle efficiency (PCE)
- 0.026%
- Rolled throughput yield (RTY)
- 87.3%
- Customer demand per day
- 1,800 boards
- Line capacity per day
- 1,275 boards
- Bottleneck
- Press-Fit Iso-Connector
Reading the bottleneck
The bottleneck is "Press-Fit Iso-Connector": it can process 1,275 boards per day against a demand of 1,800 boards, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 33.0 s to 41.6 s, against a takt of 30.0 s. The largest loss at this step is equipment downtime (uptime 84%), about 6.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of EV Batteries & E-Powertrain: EV Batteries & E-Powertrain
- High-Nickel NMC Prismatic Cell Line
- LFP Cell-to-Pack (CTP) Blade Line
- Vacuum-Brazed Aluminum Battery Cold Plate
- Shielded 800V Orange HV Cable Harness
- 22kW Bi-Directional On-Board Charger
- 3kW 800V-to-12V DC-DC Step-Down Unit
- Dual-Standard CCS2 / NACS Motorized Inlet
- High-Voltage Pyrotechnic Safety Fuse
- 48V Belt-Starter & Lithium Sub-Pack
- Solid-State Oxide Electrolyte Pilot Line
- Standardized Battery-Swap Pack Station