Multi-Zone EV Heat-Pump Cabin HVAC Unit

Product family: Blower, Heater & Flap Modules.

Flow: HVAC plastics supplier → Multi-Slide Case Mold → Flap Foam Overmold & Seal → Core & PTC Heater Drop-In → Vibration Spin-Weld Housing → Airflow Curve & Flap Torque → Front Cockpit Bulkhead

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Zone EV Heat-Pump Cabin HVAC UnitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. HVAC plastics supplier → Multi-Slide Case Mold (37.0 s) → Flap Foam Overmold & Seal (43.0 s) → Core & PTC Heater Drop-In (55.0 s) → Vibration Spin-Weld Housing (39.1 s) → Airflow Curve & Flap Torque (28.3 s) → Front Cockpit Bulkhead.SUPPLIERHVAC plasticssupplierI1.40 d1Multi-Slide CaseMoldC/T 37.0 sI1.50 d2Flap FoamOvermold & SealC/T 43.0 sI1.60 d3Core & PTC HeaterDrop-InC/T 55.0 sI0.70 d4VibrationSpin-Weld HousingC/T 39.1 sI0.40 d5Airflow Curve &Flap TorqueC/T 28.3 sI0.60 dCUSTOMERFront CockpitBulkhead1,050 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Multi-Slide Case Mold37.0 s28 min93%98.1%8401,470 (1.40 d)1,280
2. Flap Foam Overmold & Seal43.0 s22 min91%96.8%5251,575 (1.50 d)1,052
3. Core & PTC Heater Drop-In55.0 s30 min85%95.5%4201,680 (1.60 d)731
4. Vibration Spin-Weld Housing39.1 s8 min95%98.7%158735 (0.70 d)1,218
5. Airflow Curve & Flap Torque28.3 s5 min98%99.6%105420 (0.40 d)1,759

Key figures

Takt time
51.4 s
Lead time
6.20 d
Value-added time
202 s
Process cycle efficiency (PCE)
0.060%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
1,050 units
Line capacity per day
731 units
Bottleneck
Core & PTC Heater Drop-In

Reading the bottleneck

The bottleneck is "Core & PTC Heater Drop-In": it can process 731 units per day against a demand of 1,050 units, so it falls short of demand by 30.4%. Once downtime and scrap are counted, its cycle time grows from 55.0 s to 67.8 s, against a takt of 51.4 s. The largest loss at this step is equipment downtime (uptime 85%), about 9.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Interior Trim, Seating & Cockpit: Interior Trim, Seating & Cockpit