Ventilated Massage Leather Front Seat

Product family: Power Memory Seat Sets.

Flow: Seat-frame & leather supplier → Seat Recliner Laser Weld → MDI Cold-Cure Seat Foam → Ventilation Fan & Trim Hog → Side Airbag Stitch Torque → 42-Point Weight & Motor EOL → OEM Seat Track JIS Bay

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ventilated Massage Leather Front SeatSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Seat-frame & leather supplier → Seat Recliner Laser Weld (35.3 s) → MDI Cold-Cure Seat Foam (41.0 s) → Ventilation Fan & Trim Hog (52.0 s) → Side Airbag Stitch Torque (37.3 s) → 42-Point Weight & Motor EOL (27.0 s) → OEM Seat Track JIS Bay.SUPPLIERSeat-frame &leathersupplierI1.40 d1Seat ReclinerLaser WeldC/T 35.3 sI1.50 d2MDI Cold-CureSeat FoamC/T 41.0 sI1.60 d3Ventilation Fan &Trim HogC/T 52.0 sI0.70 d4Side AirbagStitch TorqueC/T 37.3 sI0.40 d542-Point Weight &Motor EOLC/T 27.0 sI0.60 dCUSTOMEROEM Seat TrackJIS Bay1,100 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Seat Recliner Laser Weld35.3 s28 min93%98.1%8801,540 (1.40 d)1,341
2. MDI Cold-Cure Seat Foam41.0 s22 min91%96.8%5501,650 (1.50 d)1,103
3. Ventilation Fan & Trim Hog52.0 s30 min85%95.5%4401,760 (1.60 d)773
4. Side Airbag Stitch Torque37.3 s8 min95%98.7%165770 (0.70 d)1,277
5. 42-Point Weight & Motor EOL27.0 s5 min98%99.6%110440 (0.40 d)1,844

Key figures

Takt time
49.1 s
Lead time
6.20 d
Value-added time
193 s
Process cycle efficiency (PCE)
0.057%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
1,100 units
Line capacity per day
773 units
Bottleneck
Ventilation Fan & Trim Hog

Reading the bottleneck

The bottleneck is "Ventilation Fan & Trim Hog": it can process 773 units per day against a demand of 1,100 units, so it falls short of demand by 29.8%. Once downtime and scrap are counted, its cycle time grows from 52.0 s to 64.1 s, against a takt of 49.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 9.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Interior Trim, Seating & Cockpit: Interior Trim, Seating & Cockpit