Soft-Touch Slush-Molded Cockpit Assembly

Product family: Complete Instrument Panels.

Flow: Polymer skin & foam supplier → Nickel Shell Slush Mold → PU Back-Injection Foam → Laser Airbag Weakening → Display, Air Vent & Duct Fit → Acoustic squeak-rattle Camera → OEM Cockpit JIS Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Soft-Touch Slush-Molded Cockpit AssemblySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Polymer skin & foam supplier → Nickel Shell Slush Mold (45.0 s) → PU Back-Injection Foam (53.0 s) → Laser Airbag Weakening (67.0 s) → Display, Air Vent & Duct Fit (48.0 s) → Acoustic squeak-rattle Camera (34.5 s) → OEM Cockpit JIS Line.SUPPLIERPolymer skin &foam supplierI1.40 d1Nickel ShellSlush MoldC/T 45.0 sI1.50 d2PU Back-InjectionFoamC/T 53.0 sI1.60 d3Laser AirbagWeakeningC/T 67.0 sI0.70 d4Display, Air Vent& Duct FitC/T 48.0 sI0.40 d5Acousticsqueak-rattle…C/T 34.5 sI0.60 dCUSTOMEROEM Cockpit JISLine860 / modules

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Nickel Shell Slush Mold45.0 s28 min93%98.1%6881,204 (1.40 d)1,052
2. PU Back-Injection Foam53.0 s22 min91%96.8%4301,290 (1.50 d)854
3. Laser Airbag Weakening67.0 s30 min85%95.5%3441,376 (1.60 d)600
4. Display, Air Vent & Duct Fit48.0 s8 min95%98.7%129602 (0.70 d)992
5. Acoustic squeak-rattle Camera34.5 s5 min98%99.6%86344 (0.40 d)1,443

Key figures

Takt time
62.8 s
Lead time
6.20 d
Value-added time
248 s
Process cycle efficiency (PCE)
0.074%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
860 modules
Line capacity per day
600 modules
Bottleneck
Laser Airbag Weakening

Reading the bottleneck

The bottleneck is "Laser Airbag Weakening": it can process 600 modules per day against a demand of 860 modules, so it falls short of demand by 30.3%. Once downtime and scrap are counted, its cycle time grows from 67.0 s to 82.5 s, against a takt of 62.8 s. The largest loss at this step is equipment downtime (uptime 85%), about 11.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.