Heated Capacitive Hands-Off Steering Wheel

Product family: Magnesium Core Leather Wheels.

Flow: Magnesium die-cast supplier → Die-Cast Armature Trim → PU Rim Reaction Mold → HOD Sensor & Heater Wrap → Hand-Stitch French Seam → Airbag Horn Switch & Pull → OEM Steering Column Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Heated Capacitive Hands-Off Steering WheelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Magnesium die-cast supplier → Die-Cast Armature Trim (27.8 s) → PU Rim Reaction Mold (32.4 s) → HOD Sensor & Heater Wrap (41.0 s) → Hand-Stitch French Seam (29.3 s) → Airbag Horn Switch & Pull (21.2 s) → OEM Steering Column Line.SUPPLIERMagnesiumdie-castsupplierI1.40 d1Die-Cast ArmatureTrimC/T 27.8 sI1.50 d2PU Rim ReactionMoldC/T 32.4 sI1.60 d3HOD Sensor &Heater WrapC/T 41.0 sI0.70 d4Hand-StitchFrench SeamC/T 29.3 sI0.40 d5Airbag HornSwitch & PullC/T 21.2 sI0.60 dCUSTOMEROEM SteeringColumn Line1,400 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Die-Cast Armature Trim27.8 s28 min93%98.1%1,1201,960 (1.40 d)1,703
2. PU Rim Reaction Mold32.4 s22 min91%96.8%7002,100 (1.50 d)1,396
3. HOD Sensor & Heater Wrap41.0 s30 min85%95.5%5602,240 (1.60 d)980
4. Hand-Stitch French Seam29.3 s8 min95%98.7%210980 (0.70 d)1,626
5. Airbag Horn Switch & Pull21.2 s5 min98%99.6%140560 (0.40 d)2,348

Key figures

Takt time
38.6 s
Lead time
6.20 d
Value-added time
152 s
Process cycle efficiency (PCE)
0.045%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
1,400 units
Line capacity per day
980 units
Bottleneck
HOD Sensor & Heater Wrap

Reading the bottleneck

The bottleneck is "HOD Sensor & Heater Wrap": it can process 980 units per day against a demand of 1,400 units, so it falls short of demand by 30.0%. Once downtime and scrap are counted, its cycle time grows from 41.0 s to 50.5 s, against a takt of 38.6 s. The largest loss at this step is equipment downtime (uptime 85%), about 7.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.