Curved Pillar-to-Pillar Glass Display Module
Product family: Dual-OLED Bonded HMI Displays.
Flow: Cover-glass supplier → AR Glass Cleanroom Rinse → OCA Vacuum Optical Bond → Autoclave Debubble Cure → Die-Cast Spine & Fan Mate → Mura Uniformity & Touch Check → Cockpit JIS Tier-1
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. AR Glass Cleanroom Rinse | 63.0 s | 28 min | 93% | 98.1% | 496 | 868 (1.40 d) | 752 |
| 2. OCA Vacuum Optical Bond | 73.0 s | 22 min | 91% | 96.8% | 310 | 930 (1.50 d) | 620 |
| 3. Autoclave Debubble Cure | 92.0 s | 30 min | 85% | 95.5% | 248 | 992 (1.60 d) | 437 |
| 4. Die-Cast Spine & Fan Mate | 66.0 s | 8 min | 95% | 98.7% | 93 | 434 (0.70 d) | 722 |
| 5. Mura Uniformity & Touch Check | 48.0 s | 5 min | 98% | 99.6% | 62 | 248 (0.40 d) | 1,037 |
Key figures
- Takt time
- 87.1 s
- Lead time
- 6.21 d
- Value-added time
- 342 s
- Process cycle efficiency (PCE)
- 0.10%
- Rolled throughput yield (RTY)
- 89.2%
- Customer demand per day
- 620 units
- Line capacity per day
- 437 units
- Bottleneck
- Autoclave Debubble Cure
Reading the bottleneck
The bottleneck is "Autoclave Debubble Cure": it can process 437 units per day against a demand of 620 units, so it falls short of demand by 29.6%. Once downtime and scrap are counted, its cycle time grows from 92.0 s to 113 s, against a takt of 87.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 16.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Interior Trim, Seating & Cockpit: Interior Trim, Seating & Cockpit
- Soft-Touch Slush-Molded Cockpit Assembly
- Ventilated Massage Leather Front Seat
- Ambient-Lit Acoustic Door Trim Panel
- Heated Capacitive Hands-Off Steering Wheel
- Sliding Inductive-Charge Center Console
- Recycled PET Acoustic Modular Headliner
- Multi-Zone EV Heat-Pump Cabin HVAC Unit
- 3D Molded Acoustic Tufted Cabin Carpet
- Drive-by-Wire Organ-Style Pedal Assembly
- Side Curtain Safety Airbag OPW Module
- HUD-Grade Acoustic Laminated Windshield