Ambient-Lit Acoustic Door Trim Panel

Product family: Recycled Flax-PP Door Cards.

Flow: Natural-fiber PP compound supplier → Thermo-Compression Press → Waterjet Contour & Clip Cut → Armrest Vacuum Foil Wrap → Ultrasonic Stake LED & Switch → Vision Clip Count & Flushness → OEM Door Module Line

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Ambient-Lit Acoustic Door Trim PanelSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Natural-fiber PP compound supplier → Thermo-Compression Press (16.2 s) → Waterjet Contour & Clip Cut (18.9 s) → Armrest Vacuum Foil Wrap (23.9 s) → Ultrasonic Stake LED & Switch (17.1 s) → Vision Clip Count & Flushness (12.4 s) → OEM Door Module Line.SUPPLIERNatural-fiberPP compoundsupplierI1.40 d1Thermo-CompressionPressC/T 16.2 sI1.50 d2Waterjet Contour& Clip CutC/T 18.9 sI1.60 d3Armrest VacuumFoil WrapC/T 23.9 sI0.70 d4Ultrasonic StakeLED & SwitchC/T 17.1 sI0.40 d5Vision Clip Count& FlushnessC/T 12.4 sI0.60 dCUSTOMEROEM Door ModuleLine2,400 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Thermo-Compression Press16.2 s28 min93%98.1%1,9203,360 (1.40 d)2,923
2. Waterjet Contour & Clip Cut18.9 s22 min91%96.8%1,2003,600 (1.50 d)2,394
3. Armrest Vacuum Foil Wrap23.9 s30 min85%95.5%9603,840 (1.60 d)1,681
4. Ultrasonic Stake LED & Switch17.1 s8 min95%98.7%3601,680 (0.70 d)2,786
5. Vision Clip Count & Flushness12.4 s5 min98%99.6%240960 (0.40 d)4,015

Key figures

Takt time
22.5 s
Lead time
6.20 d
Value-added time
88.5 s
Process cycle efficiency (PCE)
0.026%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
2,400 parts
Line capacity per day
1,681 parts
Bottleneck
Armrest Vacuum Foil Wrap

Reading the bottleneck

The bottleneck is "Armrest Vacuum Foil Wrap": it can process 1,681 parts per day against a demand of 2,400 parts, so it falls short of demand by 29.9%. Once downtime and scrap are counted, its cycle time grows from 23.9 s to 29.4 s, against a takt of 22.5 s. The largest loss at this step is equipment downtime (uptime 85%), about 4.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Interior Trim, Seating & Cockpit: Interior Trim, Seating & Cockpit