Drive-by-Wire Organ-Style Pedal Assembly
Product family: Hall-Effect E-Gas & Brake Pedals.
Flow: PA66-GF50 compound supplier → Long-Glass Structural Mold → Dual Hall Sensor Clip → Friction Hysteresis Spring Fit → Robotic Pin & Grease → 100% Force-Voltage Curve → OEM Firewall Cell
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Long-Glass Structural Mold | 25.1 s | 28 min | 93% | 98.1% | 1,240 | 2,170 (1.40 d) | 1,886 |
| 2. Dual Hall Sensor Clip | 29.3 s | 22 min | 91% | 96.8% | 775 | 2,325 (1.50 d) | 1,544 |
| 3. Friction Hysteresis Spring Fit | 36.9 s | 30 min | 85% | 95.5% | 620 | 2,480 (1.60 d) | 1,089 |
| 4. Robotic Pin & Grease | 26.5 s | 8 min | 95% | 98.7% | 233 | 1,085 (0.70 d) | 1,798 |
| 5. 100% Force-Voltage Curve | 19.2 s | 5 min | 98% | 99.6% | 155 | 620 (0.40 d) | 2,593 |
Key figures
- Takt time
- 34.8 s
- Lead time
- 6.20 d
- Value-added time
- 137 s
- Process cycle efficiency (PCE)
- 0.041%
- Rolled throughput yield (RTY)
- 89.2%
- Customer demand per day
- 1,550 units
- Line capacity per day
- 1,089 units
- Bottleneck
- Friction Hysteresis Spring Fit
Reading the bottleneck
The bottleneck is "Friction Hysteresis Spring Fit": it can process 1,089 units per day against a demand of 1,550 units, so it falls short of demand by 29.7%. Once downtime and scrap are counted, its cycle time grows from 36.9 s to 45.5 s, against a takt of 34.8 s. The largest loss at this step is equipment downtime (uptime 85%), about 6.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Interior Trim, Seating & Cockpit: Interior Trim, Seating & Cockpit
- Soft-Touch Slush-Molded Cockpit Assembly
- Ventilated Massage Leather Front Seat
- Ambient-Lit Acoustic Door Trim Panel
- Heated Capacitive Hands-Off Steering Wheel
- Sliding Inductive-Charge Center Console
- Recycled PET Acoustic Modular Headliner
- Multi-Zone EV Heat-Pump Cabin HVAC Unit
- 3D Molded Acoustic Tufted Cabin Carpet
- Curved Pillar-to-Pillar Glass Display Module
- Side Curtain Safety Airbag OPW Module
- HUD-Grade Acoustic Laminated Windshield