Recycled PET Acoustic Modular Headliner

Product family: Dry-Laminated Ceiling Shells.

Flow: Glass-fiber mat supplier → PU Core Pre-Heat Stack → Hot Press Cure & Release → Robot Edge Waterjet Trim → Grip Handle & Wire Gluing → Clean White-Glove Inspect → OEM Trim Line Window Install

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Recycled PET Acoustic Modular HeadlinerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Glass-fiber mat supplier → PU Core Pre-Heat Stack (39.7 s) → Hot Press Cure & Release (46.0 s) → Robot Edge Waterjet Trim (58.0 s) → Grip Handle & Wire Gluing (42.0 s) → Clean White-Glove Inspect (30.3 s) → OEM Trim Line Window Install.SUPPLIERGlass-fiber matsupplierI1.40 d1PU Core Pre-HeatStackC/T 39.7 sI1.50 d2Hot Press Cure &ReleaseC/T 46.0 sI1.60 d3Robot EdgeWaterjet TrimC/T 58.0 sI0.70 d4Grip Handle &Wire GluingC/T 42.0 sI0.40 d5Clean White-GloveInspectC/T 30.3 sI0.60 dCUSTOMEROEM Trim LineWindow Install980 / parts

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. PU Core Pre-Heat Stack39.7 s28 min93%98.1%7841,372 (1.40 d)1,193
2. Hot Press Cure & Release46.0 s22 min91%96.8%4901,470 (1.50 d)984
3. Robot Edge Waterjet Trim58.0 s30 min85%95.5%3921,568 (1.60 d)693
4. Grip Handle & Wire Gluing42.0 s8 min95%98.7%147686 (0.70 d)1,134
5. Clean White-Glove Inspect30.3 s5 min98%99.6%98392 (0.40 d)1,643

Key figures

Takt time
55.1 s
Lead time
6.20 d
Value-added time
216 s
Process cycle efficiency (PCE)
0.064%
Rolled throughput yield (RTY)
89.2%
Customer demand per day
980 parts
Line capacity per day
693 parts
Bottleneck
Robot Edge Waterjet Trim

Reading the bottleneck

The bottleneck is "Robot Edge Waterjet Trim": it can process 693 parts per day against a demand of 980 parts, so it falls short of demand by 29.3%. Once downtime and scrap are counted, its cycle time grows from 58.0 s to 71.5 s, against a takt of 55.1 s. The largest loss at this step is equipment downtime (uptime 85%), about 10.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.