EDTA / EDDHA Iron Chelated Micro-Granule Plant

Product family: Water-Soluble Drip Micronutrients.

Flow: Synthetic Amines & Iron Salts → Controlled pH Reactor Chelate → Evaporator Concentration Vat → Fluidized Spray Micro-Granule → Chelating Index UV-Vis QC → 25kg Moisture-Barrier Foil Bag → Greenhouse Fertigation

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: EDTA / EDDHA Iron Chelated Micro-Granule PlantSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Synthetic Amines & Iron Salts → Controlled pH Reactor Chelate (2,040 s) → Evaporator Concentration Vat (2,550 s) → Fluidized Spray Micro-Granule (3,180 s) → Chelating Index UV-Vis QC (2,160 s) → 25kg Moisture-Barrier Foil Bag (1,740 s) → Greenhouse Fertigation.SUPPLIERSyntheticAmines & IronSaltsI1.61 d1Controlled pHReactor ChelateC/T 2,040 sI1.78 d2EvaporatorConcentration VatC/T 2,550 sI2.00 d3Fluidized SprayMicro-GranuleC/T 3,180 sI1.00 d4Chelating IndexUV-Vis QCC/T 2,160 sI1.22 d525kgMoisture-Barrier…C/T 1,740 sI2.22 dCUSTOMERGreenhouseFertigation18 / tonnes

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Controlled pH Reactor Chelate2,040 s30 min94%98.8%2729 (1.61 d)24
2. Evaporator Concentration Vat2,550 s45 min90%97.4%2732 (1.78 d)18
3. Fluidized Spray Micro-Granule3,180 s35 min84%95.8%1836 (2.00 d)13
4. Chelating Index UV-Vis QC2,160 s10 min95%98.5%718 (1.00 d)23
5. 25kg Moisture-Barrier Foil Bag1,740 s15 min96%99.3%922 (1.22 d)29

Key figures

Takt time
3,000 s
Lead time
10.0 d
Value-added time
11,670 s
Process cycle efficiency (PCE)
2.2%
Rolled throughput yield (RTY)
90.2%
Customer demand per day
18 tonnes
Line capacity per day
13 tonnes
Bottleneck
Fluidized Spray Micro-Granule

Reading the bottleneck

The bottleneck is "Fluidized Spray Micro-Granule": it can process 13 tonnes per day against a demand of 18 tonnes, so it falls short of demand by 27.0%. Once downtime and scrap are counted, its cycle time grows from 3,180 s to 3,952 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 84%), about 606 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Agrochemicals, Fertilizers & Bio-Inputs: Agrochemicals, Fertilizers & Bio-Inputs